Similar Projects
6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Paving Work
New Construction
Results
Milwaukee, WI 53202

Bioswale
New Construction
Results
Milwaukee, WI

2020 Asphalt Pavement Repair
Results
Less than $69,000 est. value
Cedarburg, WI 53012

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Road Repairs - Entrance Lot C to Sunset Campgrounds
Results
Less than $461,000 est. value
Kansasville, WI 53139

2020 Concrete Pavement Maintenance and Repairs
Results
Less than $78,000 est. value
Milton, WI 53563

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

Last Updated 12/20/2021 01:51 AM
Project Title

C. Sheboygan, Indiana Avenue, Esslingen Park to South 24th Street

Physical Address View project details and contacts
City, State (County) WI   (Sheboygan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $75,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sheboygan County; 4291-02-71, WISC 2022 107; Local Street; 0.000 Miles; Grade, Storm Sewer, Sanitary Sewer, Water Main, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Beam Guard, Signing, Signals, Lighting, Pavement Marking, and a Structure. Excavation Common, 18,561 CY; Base Aggregate Dense, 18,831 Ton; Breaker Run, 10,555 Ton; Concrete Pavement, 10,816 SY; Concrete Masonry Bridges, 122 CY; Bar Steel Reinforcement Coated 11,060 Lbs; Marking Paint, 19,138 LF; Construction Staking, 16,550 LF; Construction Staking, 76 Each; Construction Staking, 2 LS; Conduit, 8,000 LF; Storm Sewer Pipe, 10 LF 10“, 1,134 LF 12“, 14 LF 19“, 250 LF 15“, 21 LF 18“, 13 LF 30”, 82 LF 36”; Concrete Curb, 89 LF; Concrete Curb and Gutter, 10,181 LF; Concrete Sidewalk, 10,446 SF; Beam Guard, 146 LF; Beam Guard Energy Absorbing Terminals, 2 Each; Asphaltic Surface, 647 Ton; HMA Pavement, 2,460 Ton; Signs, 479 SF; Riprap, 36 CY; Pull Boxes, 25 Each; Concrete Bases, 48 Each; Poles, 46 Each; Sanitary Sewer 10-Inch, 20 LF; Water Main PVC, 2,531 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents