Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$10,000 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

McAlister's Deli / Hermitage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hermitage, PA 16148

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

300 Tons Superpave Wearing Course
Infrastructure
Post-Bid
Grove City, PA

Mercer Group M21
Infrastructure
Results
$1,000,000 to $2,499,999 est. value
PA

Last Updated 07/19/2023 02:33 PM
Project Title

City of Hermitage Athletic Complex Dek Hockey

Physical Address View project details and contacts
City, State (County) Hermitage, PA 16148   (Mercer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid work consisting of fine grading, construction of two types of concrete pavement, installation of two trench drains, installation of a concrete band/flush curb, and construction of an asphalt trail. Add Alternate 1 - 7 contain alternate bids for site preparation as outlined in the bid specifications. The City of Hermitage reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are e deemed to be in the best interest of the City of Hermitage, and to reject any or all proposals. The Project has an expected duration of 60 days from the date of issuance of the Notice to Proceed. Question Deadline 07/14/2023 at 1:00

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents