Similar Projects
Construct Company Headquarters and Administration Supply Building-Macon Training Site
New Construction, Infrastructure
Bidding
$9,000,000 CJ est. value
Macon, MO 63552

Roadwork
Post-Bid
Kirksville, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Roadwork, Road Repair, Maintenance and Construction MATOC
New Construction, Term Contract
Results
Kanopolis, KS - Blue Springs, Saint Charles, MO

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

Hot Mix, Cold Mix, and Winter Mix
Infrastructure
Post-Bid
Macon, MO

Resurface from Rte 136
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Resurface from Bus. 63
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

2022 Asphalt Construction and Repairs
Term Contract, Infrastructure
Results
MO

Resurface
Infrastructure
Post-Bid
$1,500,000 to $2,500,000 est. value

Resurface and Add Shoulder
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Rock Salt
Term Contract
Post-Bid
Kirksville, MO 63501

Grading and Pavement
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Last Updated 08/09/2022 12:08 AM
Project Title

Pavement Resurfacing

Physical Address View project details and contacts
City, State (County) Linneus, MO 64653   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $19,153,962 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job JNE0166 Route VARIOUS ADAIR, LINN, MACON, SCHUYLER, SCOTLAND County. Pavement resurfacing from Rte. A to Rte. 15 in Scotland County, Rte. N and Rte. E in Scotland County, Rte. A in Schuyler and Adair Counties, Rte. J and K in Adair County, Rte. JJ, Rte. HH and Rte. EE in Macon County, Rte. J in Macon and Linn Counties, the total length of improvement being 108.422 miles. Range: $15M to $20M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - B04 - Pavement Resurfacing *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Notice to Proceed: August 18, 2022 Completion Date: June 30, 2023

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents