Similar Projects
HVAC Equipment and Consumables
Term Contract
Results
Less than $90,000 est. value
Ocala, FL

Heating, Ventilation and Air Conditioning (HVAC) Replacement - North Region
Results

OPD Headquarters - A/C Computer Program System Upgrade
Results
Ocala, FL 34471

HVAC Upgrades for Marion County Fire Rescue Station #1
Post-Bid
Ocala, FL 34479

Marion County Health Department Compressor and Condenser Coil Replacement
Results
Less than $22,000 est. value
Ocala, FL 34470

HVAC Services 2021
Results
Ocala, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Rooftop Unit (RTU) Replacement
Results

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Mechanical/HVAC Trade Contract Services
Results
Ocala, FL

A/C Replacements In Pods A-D
Alteration
Results
Ocala, FL 34475

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Health Department - Back Up Chiller Replacement
Alteration
Results
Ocala, FL 34471

Marion County Sheriff Office Villages AC Replacement
Alteration
Results
$16,286 est. value
The Villages, FL 32162

Marion County Sheriff Office Villages Ac Replacement
Alteration
Results
$16,286 est. value
The Villages, FL 32162

Reported 10/14/2021 08:49 AM
Project Title

Energy Management Control System Replacement - Sheriff OPS

Physical Address View project details and contacts
City, State (County) Ocala, FL 34475   (Marion County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Computrols system shall directly control HVAC equipment as per a sequence of operations designed by the Contractor for HVAC controls. Each equipment controller shall provide occupied and unoccupied modes of operation by individual zone. The systems shall have energy conservation features such as optimal start and stop, night setback, request-based logic, and demand level adjustment of set points as specified in the sequence, trim and respond, VFD monitoring and control, Enthalpy economizer controls, and carbon dioxide sensors calibration as per the existing configuration as well as automatic demand response and load shedding programming.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents