Similar Projects
Repair Of Sewage Lift Station
Term Contract
Bidding
Montgomery, AL 36108

2020 PS03 Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, Brighton, AL 35203

Bypass Pump Installation - Uniroyal Lift Station
Post-Bid
Opelika, AL 36801

Clements Road Water Booster Station Improvements Project
Post-Bid
Tuscaloosa, AL

2019 CDBG Sewer Improvements
Results
Less than $229,030 est. value
Chatom, AL 36518

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Sanitary Sewer System - Asset Management Program - Pump Station Upgrades
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Birmingham, AL

Bob Jones Lift Station 2021 Improvements (Contract B)
Post-Bid
Scottsboro, AL

Repair Lift Station And Oil Water Separators
Results
$500,000 to $1,000,000 est. value
Montgomery, AL 36108

Contract A: Install a Booster Pump Station
New Construction
Bidding
Grant, AL

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Lift Station 1 and 2 Rehabilitation
Results
Less than $900,000 est. value
Dadeville, AL

6th Street Lift Station Improvements
Renovation
Bidding
Muscle Shoals, AL

Proposed Booster Pump Station & Water Line Improvements
New Construction
Post-Bid
$1,500,000 est. value
Smiths Station, AL

Reported 02/25/2022 12:00 AM
Project Title

Flygt Pumps for Lift Station

Physical Address View project details and contacts
City, State (County) Daphne, AL   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work shall consist of supplying approximately ten (10) of the following pumps to Daphne Utilities Water Reclamation Department: Flygt NP3153 HT3 submersible pumps (20HP, 230/3/60, FLS) Pumps must be brand specific to work with the mechanics of the lift station system already in place.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents