Similar Projects
Kingsway & Cantu - City of Del Rio
Infrastructure
Conception
$698,600 CJ est. value
Del Rio, TX 78840

Kingsway & Cantu - City of Del Rio
Infrastructure
Conception
$698,600 CJ est. value
Del Rio, TX 78840

Repair Overruns on Center Runway
Infrastructure
Design
$6,000,000 CJ est. value
Laughlin AFB, TX 78843

Repair Overruns on Center Runway
Infrastructure
Design
$6,000,000 CJ est. value
Laughlin AFB, TX 78843

Dredging Services at the Wastewater Treatment Plants
Infrastructure
Bidding
$5,000,000 CJ est. value
Del Rio, TX 78840

Del Rio Terminal Entrance Sign and Landscaping
Infrastructure
Bidding
$315,000 CJ est. value
Del Rio, TX 78840

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Trees and Debris Removal, Installation of Gravel, Del Rio, TX
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Del Rio, TX 78840

Hunter Subdivision Mill and Overlay Project
Results
Del Rio, TX 78840

International Bridge Road Mill and Overlay
Results
Del Rio, TX

Dodson Storage - Building A
New Construction, Infrastructure - 16,200 SF
Pending Verification
$3,250,000 CJ est. value
Del Rio, TX 78840

Sports Park Walking Trails Lighting - City of Del Rio
Infrastructure
Conception
$470,000 CJ est. value
Del Rio, TX 78840

Alcoa Fields Black Screened Dirt, Sandy Loam And Grade Work For The Alcoa Fields At Frontera Road
Infrastructure
Design
$2,000,000 CJ est. value
Del Rio, TX 78840

Two Lane Road at International Bridge Project
Infrastructure
Post-Bid
$400,000 est. value
Del Rio, TX

US0277 - Cleaning and Sealing Cracks
Infrastructure
Results
$315,370 est. value
TX

Last Updated 10/25/2022 11:31 AM
Project Title

TPW Rincon/Magnolia Nature Trail - City of Del Rio

Physical Address View project details and contacts
City, State (County) Del Rio, TX 78840   (Val Verde County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $276,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. The project is included in the city's 2022-2026 capital improvement plan (CIP). As of October 25, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents