Similar Projects
Hanna Steel Manufacturing Plant Addition
Addition, Demolition, Infrastructure - 9,000 SF
Design
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Angelo Bruno Business Library Renovation
Renovation - 60,000 SF
Post-Bid
$4,320,605 est. value
Tuscaloosa, AL 35401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ruby Tyler Improvements Alabama Department of Forensic Science
Results
Less than $493,560 est. value
Tuscaloosa, AL

Brookwood Parkway Water Main
Infrastructure
Results
Vance, AL 35490

Delta Gamma Addition
Renovation, Addition
Construction
$1,153,100 est. value
Tuscaloosa, AL 35401

Clinical Services and Research MRI Addition to Student Health
Addition - 23,000 SF
Construction
$9,933,900 est. value
Tuscaloosa, AL 35404

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

SERC ECL Teaching Lab and Gas Turbine Test Cell
Renovation
Results
$450,000 est. value
Tuscaloosa, AL

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

Classroom Renovation to Nursing Lab Martin Campus
Renovation
Post-Bid
Tuscaloosa, AL 35401

New Outbuilding for Training / Prop Storage
New Construction - 25,000 SF
Results
$4,070,572 est. value
Tuscaloosa, AL

Last Updated 05/10/2023 10:09 AM
Project Title

Taylor Hardin Phase 3 Building Addition/Renovation and Utilities Package

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35404   (Tuscaloosa County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) College/University, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $62,190,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Job No.: 20-10-00560.00 **Final plans, specifications, and contract documents will be available for Printing and/or Examination on Thursday, February 24, 2022.** ADVERTISEMENT FOR BIDS The pre-bid meeting and bid opening will be held in person for this project at 405 Cahaba Circle at the Procurement Services Annex. Please contact the Project Manager if you have questions or need directions. General Contractors, Demolition/Abatement subcontractors, Sitework/Utilities Subcontractors, Mechanical subcontractors, Plumbing subcontractors, Electrical subcontractors, Fire Protection subcontractors, Roofing subcontractors and Masonry subcontractors are required to prequalify prior to requesting Bid Documents. For information on how to prequalify for this project, please go to UAbidinfo.ua.edu and click on this project in the list of projects shown. Prequalification submissions must be received by 5:00pm local time Tuesday, February 15, 2022 . Late submittals will not be accepted. For information on obtaining plans, specifications, and contract documents go to UAbidinfo.ua.edu or contact Paul Langland at TRO Jung Brannen Inc, 205-881-3140 For questions regarding this project, please contact UA Project Manager Dennis McDaniel at 205-348-6913 or dwmcdaniel2@ua.edu Scope: New Two-Story Building addition and renovation, site grading, storm drains and utilities, Mechanical, Plumbing, Electrical, Fire Protection, Roofing. Proposed Budget: 40 million deposit listed below, made payable to the Architect/Engineer, which is refundable in full upon the return of the drawings and specifications in good condition within ten days after the bid opening, else deposit shall be forfeited Change last RFI questions to from March 22, 2022, at 2pm to May 6, 2022 at 2pm.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents