Similar Projects
Orchard Downs Community Building
New Construction - 6,200 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Urbana, IL 61801

Parking Lot C-3 Improvements 2022
Infrastructure
Bidding
Champaign, IL 61820

2021-2022 Miscellaneous Repair Contract
Term Contract
Post-Bid
Urbana, IL

Curbanas/Parklets Decking System
Post-Bid
Urbana, IL

Remove Existing Box Culvert and Replace With A Single-Span Deck Beam Bridge on Concrete Pile Bent Abutments and Other Collateral Work
Results
Less than $514,211 est. value
IL

Blair Park OSLAD Development
New Construction
Results
Urbana, IL 61801

Middletown Park Tennis Courts
Renovation
Bidding
Mahomet, IL 61853

Drain Replacement And Ditch Reconstruction
Post-Bid
Urbana, IL

Asphalt Repair and Reseal
Results
Less than $300,000 est. value
Tolono, IL

Construction of a Multi-Use Path along Maplewood Drive from Clark Street to Crane Drive in Rantoul
Infrastructure
Bidding
IL

2021 Infrastructure Maintenance
Post-Bid
Champaign, IL

2021 Concrete Project
Results
Less than $125,000 est. value
Mahomet, IL

2022 Infrastructure Maintenance
Infrastructure
Bidding
Champaign, IL

Replacement of Sidewalk Ramps, PCC Sidewalk, Curb and Gutter, and PCC Pavement Patching.
Alteration
Post-Bid
Homer, IL 61849

Hessel Park Pickleball Resurfacing
Results
Champaign, IL 61820

Reported 04/06/2022 12:00 AM
Project Title

Urbana Park District Outdoor Learning Pavilion

Physical Address View project details and contacts
City, State (County) Urbana, IL   (Champaign County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022, Construction Completion Expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements to Crystal Lake Park: 1. Outdoor Learning Pavilion: Construction of a new pavilion structure to include a prefabricated shelter with interior storage, restroom, and janitorial facilities, a fireplace/hearth, drinking fountain/water bottle filling station, grills, and accessible walkways leading to the existing Nature Playscape and Anita Purves Nature Center. 2. Parking Lot: Construction of a new asphalt parking lot (27 spaces) to serve the pavilion and Day Camp programs. Associated accessible parking and pathways providing access to the new pavilion structure. Bike racks. 3. Stormwater management rain garden with underdrainage connected to existing underground stormwater system. Native planting including native seeding, native plant plugs and live stakes; and native vegetated stewardship for three years. 4. Erosion control and tree protection measures associated with the improvements

Details

Park/Playground, Renovation, Misc. Recreational, Renovation.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents