Similar Projects
Summerville Prepatory Academy
New Construction - 43,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29485

Clemson University Memorial Stadium Renovations
New Construction, Renovation
Conception
Clemson, SC 29634

Irmo High School New East Wing
New Construction, Renovation - 96,000 SF
Design
$44,000,000 est. value
Columbia, SC 29212

Byrnes High School Renovation and Addition
Renovation, Addition
Design
Duncan, SC 29334

School of Music Performance and Practice Renovation at GSUMC
Renovation
Bidding
$460,000 to $710,000 est. value
Columbia, SC 29201

North Charleston High School- Office and Cafeteria Renovation
Renovation, Addition - 11,601 SF
Bidding
$2,000,000 est. value
North Charleston, SC 29405

Construction Management at Risk Services - Robert Smalls International Academy And Battery Creek High School
Post-Bid
Beaufort, SC 29906

Wilson Hall
Addition - 37,300 SF
Post-Bid
Sumter, SC 29150

James Island Charter High School Career Technical Education (CTE)
New Construction - 30,000 SF
Results
Charleston, SC 29412

New Middle School
New Construction
Results
$35,000,000 est. value
Summerville, SC 29483

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Georgetown Middle School Renovation
Renovation
Construction
Less than $6,500,000 est. value
Georgetown, SC 29440

Greenville Triumph Stadium
New Construction
Pending Verification
$38,600,000 est. value
Mauldin, SC

New Middle School Construction
New Construction
Conception
$52,111,279 est. value
Greer, SC 29651

Patriots Point Improvements
New Construction, Renovation
Design
$14,000,000 est. value
Mount Pleasant, SC 29464

Last Updated 06/01/2022 10:16 AM
Project Title

Chapin High School Stadium Renovations

Physical Address View project details and contacts
City, State (County) Chapin, SC 29036   (Lexington County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Middle/Senior High School, Stadium
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide the construction of stadium renovations at Chapin High School using the CM-R method of project delivery. The renovations are expected to increase stadium capacity to 6,500 seats and include a new press box, concessions, restrooms and locker room.

Details

Stadium, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents