Similar Projects
Chardon Road Housing Development
New Construction
Conception
Richmond Heights, OH 44143

Work Live Structures
New Construction
Conception
Cleveland, OH 44113

The Bluffs of Seven Hills
New Construction - 200,000 SF
Design
$150,000,000 est. value
Seven Hills, OH 44131

Indian Trails Subdivision Phase II
New Construction
Design
North Royalton, OH 44133

Fire Casualty Loss Repairs at 2712 Cedar Unit #126
Post-Bid
Cleveland, OH 44104

Casualty Fire Loss Repairs at 4500 Kennard Court, Unit #577
Post-Bid
$68,000 to $98,500 est. value
Cleveland, OH 44100

Warner and Swasey Redevelopment
Renovation - 31,690 SF
Results
Cleveland, OH

Exterior Repairs
Results
Cleveland, OH 44104

Crocker Woods Subdivision
New Construction
Construction
Westlake, OH 44145

OMNI Senior Living Residential Community
New Construction - 135,000 SF
Construction
$25,000,000 est. value
North Royalton, OH 44133

Luxury Homes
New Construction
Pending Verification
Broadview Heights, OH 44147

American Dream Series at Lincoln Village
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Parma Heights, OH 44130

New Beginnings
New Construction
Design
Olmsted Township, OH 44138

Remodeling and Change of Use Single Family Residence
Renovation
Post-Bid
$126,936 est. value
Bedford Heights, OH 44146

Existing Single Family Home Remodeling - 399 Douglas Boulevard
Renovation
Results
Less than $179,423 est. value
Richmond Heights, OH 44143

Reported 01/09/2020 12:00 AM
Project Title

Casualty Fire Loss Repairs at 4325 Case Court #232

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44100   (Cuyahoga County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $67,000 to $98,500
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Metal-framed interior walls shall be repaired and replaced as required. New gypsum board shall be provided where required throughout the unit. New gypsum board wall sheathing shall be provided and installed at new wall partitions. New windows/security screens and doors shall be provided to match existing, where required. New paint shall be applied to all interior walls and ceilings. Flooring shall be removed down to substrate and replaced, where indicated. Existing damaged millwork shall be replaced per specifications. All doors/frames, closet shelving, windows, and window treatments shall be replaced one-for-one, as required. Hot water/fin tube heating shall be provided/installed throughout the unit. All new plumbing shall be provided for the bathrooms and kitchen. New plumbing fixtures shall be provided/installed in the bathrooms. The existing service will remain and new electric meters and panels shall be provided. 13. New wiring and receptacles shall be provided throughout the unit. 14. New power feeds shall be provided for all new proposed equipment.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents