Similar Projects
16 Potable Pipe Crossing of Fountain Creek
Post-Bid
Pueblo, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Platteville Boulevard Waterline
Results
Pueblo, CO 81007

Platteville Boulevard Waterline Canvas Drive to Boyero Avenue
Infrastructure
Post-Bid
Pueblo West, CO 81007

Annual Contract High Density Polyethylene (HDPE/HDPP) Pipe for Meter Pits
Term Contract
Results
Pueblo, CO 81003

Pueblo Water- Supply of 24" Mjxmj Butterfly Valves
Results
$30,000 to $35,000 est. value
Pueblo, CO 81003

Pueblo Water- Supply of 16" Mjxmj Butterfly Valves
Results
Pueblo, CO 81003

Pueblo Water - Annual Contract Corporation Stops 2021
Term Contract
Results
Pueblo, CO 81003

Annual Contract for Service Fittings
Term Contract
Results
Pueblo, CO 81003

Pueblo Water - City Wide Main Renewals 2020 PN 215104
Term Contract
Results
CO

2021 Selenium Reduction Project
Results
Pueblo, CO

Platteville Boulevard Dry Creek Crossing
Results
Pueblo, CO 81007

Six Month Contract for PVC Water Distribution Pipe
Term Contract
Results
$100,000 to $150,000 est. value
CO

Water Main Relocation at Sunset Park Elementary School
Infrastructure
Results
Pueblo, CO 81005

Last Updated 03/04/2022 06:23 AM
Project Title

Pueblo Water - City Wide Main Renewals 2022

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To install approximately 2,700 lineal feet of six-inch through eight-inch diameter water mains and appurtenances for renewal on Hudson Avenue, E. 18th Street, Norwood Avenue, and E. 21st Street. Pueblo Water will furnish all PVC pipe, valves, fire hydrants, appurtenant fittings, and service line materials. All bedding, backfill, and surface replacement materials shall be furnished by the Contractor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents