Similar Projects
DFCM Construction UU Applied Sciences Building
New Construction
Design
$62,399,123 est. value
Salt Lake City, UT 84112

Emergency Eyewash Upgrades Phase 2
Renovation, Term Contract
Bidding
$650,000 est. value
Salt Lake City, UT 84112

Health Sciences Campus Office Building
Post-Bid
Less than $78,439,728 est. value
Salt Lake City, UT

Building 565-EEJMRB Vivarium Expansion
Renovation - 8,300 SF
Post-Bid
Less than $3,200,000 est. value
Salt Lake City, UT 84112

Construction Management / General Contractor - BPRB Level 1 Lab Remodel
Renovation - 14,000 SF
Results
Less than $4,933,402 est. value
Salt Lake City, UT

Fieldhouse Seismic Upgrade
Term Contract
Results
Less than $2,409,976 est. value
Salt Lake City, UT

Science and Industry Building, 3rd Floor Laboratory Remodel
Renovation
Construction
Salt Lake City, UT 84123

Uu Meb Bldg Ece Lab Remodel Phase 2
Construction
Less than $491,794 est. value
Salt Lake City, UT 84112

CMGC Building 525 1st Floor East Side Radiology Backfill
Demolition
Post-Bid
$2,290,478 est. value
Salt Lake City, UT 84112

HEB Phases 3 and 4 Lab Renovations 3rd Floor East North Tower
Renovation
Results
Less than $120,600 est. value
Salt Lake City, UT 84112

Gillmor Hall Addition
Addition - 335,606 SF
Construction
$8,500,000 est. value
Salt Lake City, UT 84105

Med X - Wall Panelization
Renovation - 2,500 SF
Post-Bid
Less than $129,285,000 est. value
Salt Lake City, UT

Union Building Student Success Suite - Tenant Improvement
Results
Less than $643,177 est. value
Salt Lake City, UT 84112

CMGC - Relocate OB Emergency and Build 3 New Labor Delivery Rooms
Construction
Less than $1,578,828 est. value
Salt Lake City, UT 84112

Helix Building
New Construction - 250,000 SF
Post-Bid
$78,439,728 est. value
Salt Lake City, UT

Reported 07/16/2021 12:00 AM
Project Title

Remodel - Williams Building Critical Network Remodel

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84108   (Salt Lake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,458,218
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This is a critical network facility construction project focusing on the building interior space renovation. A separate construction project underway will complete the outside plant fiber optic infrastructure to connect this facility with other network nodes on the University of Utah campus. The network Node/Facility relocation to be located at the Williams Building in Research Park and will Interface with the fiber/conduit pathway. The project scope of work will include an interior renovation and commissioning of the facility. The node will include routers, switches, critical network appliances, DNS and DHCP, network time protocol (NTP), firewalls, security probes, fiber optic entry cabling, fiber distribution/cross-connects (EMF, FTU, etc.), and fiber optic cable splices.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents