Similar Projects
Mental Health Anti Ligature Door Sensors Gen 3 Upgrade Project 623-22-105
Term Contract
Design
$100,000 to $250,000 est. value
Muskogee, OK 74401

Window & Door Replacement
Alteration
Bidding
Stigler, OK 74462

Site and Building
Infrastructure, Alteration
Bidding
Norman, OK

Remove and Replace Vestibule
Alteration
Post-Bid
Duncan, OK 73533

Overhead Door
Term Contract
Post-Bid
McAlester, OK 74501

Window and Door Replacement
Alteration
Results
Kiowa, OK 74553

Hangar Door Inspections and Repair
Alteration
Results
$10,000 est. value
Tulsa, OK 74115

Window Repair and Replacement and Paint Building 6
Term Contract
Post-Bid
El Reno, OK 73036

ADA Compliant Touchless Door Operators for Public Restrooms and Outpatient Clinics
Alteration
Results
Lawton, OK

Replace Store-Front Doors - Carson Engineering
Alteration
Post-Bid
Norman, OK 73019

Fire Station No 25 Bay Door Modifications
Renovation
Results
Oklahoma City, OK

Replace Storefront Door Entries - GLCH
Alteration
Post-Bid
Norman, OK 73019

Animal Welfare Door Replacement
Alteration
Results
$112,000 est. value
Oklahoma City, OK

Entry Doors Replacement
Term Contract
Post-Bid
Oklahoma City, OK 73131

Mccasland Field House Add Exterior Windows
Term Contract, Alteration
Post-Bid
Norman, OK 73019

Reported 03/24/2022 12:00 AM
Project Title

Sargent Material to Replace Locks at Multiple Residential Life Locations

Physical Address View project details and contacts
City, State (County) State-Wide: OK
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the bid is to purchase Sargent material, No Substitutions, in bulk pricing for an OSU project to replace locks at multiple OSU Residential Life locations. OSU will provide installation. The awarded bidder/distributor of Sargent material will store the material at their location to be released in phases as needed. The awarded bidder may invoice OSU when the bulk material is stored in their location with photo documentation proof. We expect the awarded bidder to store this material no more than 12 months.

Details

Division 08 - Openings, Hardware.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents