Similar Projects
Sunnyvale Cleanwater Program Secondary Treatment and Dewatering and Sunnyvale Cleanwater Program Existing Plan Rehabilation Project
Infrastructure
Bidding
$30,000,000 est. value
Sunnyvale, CA

Alco Park Utility Storage Tank Removal Project
Alteration
Bidding
$250,000 est. value
Oakland, CA 94612

USCG Novato Demolish Water Tower and Building 125 Pump House
Demolition
Post-Bid
$250,000 to $500,000 est. value
Novato, CA

Tanks, Sumps and Accessories
Infrastructure
Post-Bid
West Sacramento, CA

Skyline Water Tank Replacement Project
Infrastructure
Results
Millbrae, CA 94030

Aboveground and Underground Storage Tanks Monitoring, Maintenance, Testing, and Repair Services
Term Contract
Results
Less than $500,000 est. value
Redwood City, CA 94063

SCWP - Secondary Treatment and Thickening/Dewatering - CAS Stage 1
Infrastructure
Bidding
$250,000,000 est. value
Sunnyvale, CA 94089

Kern County Sheriff Lerdo Water Tank Replacement
Infrastructure
Post-Bid
Bakersfield, CA 93308

FWTP Backwash Tank Interior Cleaning
Term Contract
Results
$450,000 est. value
Sacramento, CA

Randall-Bold Water Treatment Plant Chemical Storage Improvements, Phase 2
Renovation
Bidding
$1,548,200 est. value
Oakley, CA 94561

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Tank 5 and 12 Recoat and Repairs
Infrastructure
Results
$2,179,500 est. value
Modesto, CA 95355

Lone Pine Booster Station and Water Storage Project
Renovation, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Lone Pine, CA

Water Storage and Pumping Facilities
Infrastructure
Post-Bid
Fresno, CA 93723

La Crescenta East and West Reservoir Rehab and Coating Project
Renovation, Alteration
Results
$900,000 est. value
Glendale, CA 91214

Reported 06/09/2022 12:00 AM
Project Title

Central Plant Ice Tank Leak Repairs

Physical Address View project details and contacts
City, State (County) Santa Monica, CA 90405   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $45,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all prevailing wage labor, materials, equipment, services and incidentals necessary to repair leaks at existing SMC Main Campus Central Plant ice storage tanks and piping in accordance with bid documents and drawings. Total sq ft for project not available at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents