The Copper District Elevated Storage Tank Project
New Construction
Design
Clayton, NC

G G Hill WTP Lagoon Closure
Renovation
Bidding
Wake Forest, NC

Elevated Tank and Wells
Infrastructure
Bidding
NC

Neuse River Resource Recovery Facility Bioenergy Recovery
New Construction
Post-Bid
Raleigh, NC 27610

NCSSM Western Campus
New Construction, Renovation - 1,016,000 SF
Post-Bid
Morganton, NC 28655

Wastewater Treatment Facility Upgrades
Results
Surf City, NC 28455

World-Wide Water Storage Tank Remediation
Term Contract
Results

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

GUC Water Treatment Plant Phase 1 WTP Improvements
Construction
Greenville, NC 27834

Eastside Sludge Hopper Rehabilitation Project
Post-Bid
Jamestown, NC 27282

Water Treatment Plant Improvements
Results
Less than $13,000,000 est. value
Smithfield, NC 27577

Water Tank Installation on Cat 730 Articulated Truck
Post-Bid
Salisbury, NC

Northeast 0.50 Mg Elevated Water Storage Tank
Results
North Wilkesboro, NC 28659

EMJ WTP Flocculation and Sedimentation Basins 1-4 Modifications
Post-Bid
Raleigh, NC 27614

Water Reclamation Facility Clarifier Rehabilitation Project
Results
Louisburg, NC 27549

Reported 04/15/2022 12:00 AM
Project Title

New Neuse River Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Clayton, NC 27520   (Johnston County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value Greater than $120,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Clayton is building a new 6 MGD Water Reclamation Facility in a phased approach.The Town's existing wastewater treatment plant is 55 years old and is nearing the end of its usefulness. The current site is too small for major enhancement or expansion and the facility will not be able to keep up with the demands of the growth in the region. The under slab plumbing Scope of Work shall include, but is not limited to labor, materials, accessories, equipment, tools, layout, supervision, testing and inspections, shop drawings, trucking, freight, delivery, insurance, and all other services required for the compete installation of the functional and operable plumbing piping system. All Work for this project will be in accordance with the provided construction drawings, general notes, specifications and site requirements described below, and any other requirements as listed in the contract. The systems do not include the ductile iron piping systems. The ductile iron pipe systems will be provided by others concurrently while the plumbing systems are being installed. Installation of plumbing systems shall be performed prior to installation of concrete slabs and foundations. The installing subcontractor shall coordinate work with other trades as required. GFPDC will excavate and establish the building pad elevations. SUBCONTRACTOR will be responsible for additional excavation as required. Extend plumbing systems 5 ft outside the building envelope. This Scope of Work only applies to the under slab plumbing. Plumbing for the balance of plant will be advertised as a separate package. Surveying and third-party testing to be provided by GFPDC The under slab ductile iron piping Scope of Work shall include, but is not limited to labor, materials, accessories, equipment, tools, layout, supervision, testing and inspections, shop drawings, trucking, freight, delivery, insurance, and all other services required for the compete installation of the functional and operable piping system. All Work for this project will be in accordance with the provided construction drawings, general notes, specifications and site requirements described below, and any other requirements as listed in the contract. The ductile iron pipe and fittings have been procured by GFPDC and will delivered to the site for installation by the SUBCONTRACTOR. SUBCONTRACTOR will be responsible for unloading and storing of material. Blowers 1. Furnish the blowers for the bioreactor and aerated sludge tanks. There are (2)separate systems. 2. Each system shall have a master control panel (MCP) that will be responsible for the staging of the blowers to maintain a SCADA provided pressure setpoint (adjustable). 3. Furnish the specified spare parts. 4. Furnish the required manuals. 5. Provide start up services. 6. Provide onsite training services. Switchgear 1. Furnish the switchgear (SWGR) and motor control centers (MCCs) for the project. 2. Furnish the specified spare parts. 3. Furnish the required manuals. 4. Provide startup/commissioning services. 5. Provide onsite training services. Generators Furnish the two 3,300KW Diesel Generator Sets. Furnish fuel storage tanks that supply 72 hours fuel. Include all costs itemized in proposal: equipment, spare parts, sales tax, freight/packaging, startup/commissioning, training, warranty and installation. In addition, provide a monthly storage cost if equipment needs to be held until the site is ready to receive. Clarifiers Furnish and install three (3) clarifier mechanisms associated with the clarifier tanks. Each clarifier will include an access platform that will interface with an external platform provided by others. Provide all required supports for installation of clarifier mechanisms. Provide drive mechanisms, center piers, sludge collection headers, center cages, skimmer supports for truss and manifold, walkways and bridges, influent feed wells, energy dissipating inlets, surface skimmer mechanisms, surface preparation and finishing, scum spray systems, control and integration, and spare parts. UV System 1. Furnish the UV Disinfection System. 2. Each system shall have a control system that will be responsible for controlling and monitoring the UV Disinfection System and interfacing with the SCADA system. 3. Furnish the specified spare parts. 4. Furnish the required manuals. 5. Provide start up services. 6. Provide onsite training services. Furnish an open channel, gravity flow, low-pressure, high intensity lamp ultraviolet (UV) disinfection system complete with an automatic cleaning system, lamps, power distribution, electronic ballasts, control equipment, UV detection equipment, spare parts and accessories as shown on the Contract Drawing and specified herein. Screw Press 1. Furnish the Screw Press Dewatering System. 2. Each system shall have a control system that will be responsible for controlling and monitoring the Screw Press System and interfacing with the SCADA system.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents