Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Mount Diablo Boulevard Multi-Use Development
New Construction, Infrastructure - 4,300 SF
Design
$10,000,000 CJ est. value
Lafayette, CA 94549

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Pvmt Rehabilitation, Slab Repl, Ada Curb Ramp and Install Guardrail
Infrastructure
Bidding
$51,000,000 CJ est. value
Pittsburg, CA 94565

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Military Ocean Terminal Concord (MOTCO) Waterfront Water Distribution Project
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Water Leak Repair-Richmond
Alteration
Results
$400,000 est. value
Richmond, CA 94804

Gladys Drive and Vicinity Main Replacement
Infrastructure
Results
$5,150,000 est. value
Pleasant Hill, CA

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Walden Garden Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Walnut Creek, CA 94597

Waterline Improvement - Kent Drive - City Of Brentwood
Alteration
Conception
$336,000 est. value
Brentwood, CA 94513

AutoZone #3343 / Pittsburg
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Pittsburg, CA 94565

Last Updated 01/17/2023 08:31 AM
Project Title

Water Main Replacement at Various Locations

Physical Address View project details and contacts
City, State (County) Antioch, CA 94509   (Contra Costa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,766,500 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing and installing new domestic water facilities.Additional work shall include, but not be limited to,surface restoration,traffic control, and water pollution control. Location: August Way, Louis Drive, Inland Court, East 13 th Street, Nash Avenue and Eagleridge Drive in the City of Antioch. The estimated cost of construction is $2,500,000.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents