Project Title | 230kV Underground Electrical Package for Lake Highland Substation, and 115kV Underground Electrical Package for Lake Highland Substation to Weber Substation |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32801 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Install two circuits with 115 kV transmission cables in Orlando, Florida. The new 115 kV circuits will connect the Weber Substation to Lake Highland Substation in at two locations. This work includes furnishing and installing cables and accessories per supplied drawings for Line 5-0737-1 and furnishing cables and accessories for Line 5-0137-2. This scope also includes the construction of a new 230 kV transmission line in Orlando, Florida. The new 230 kV circuit will ultimately connect the Lake Highland Substation to the Stanton Energy Center. This work under the established specifications will include furnishing and installing cable and accessories per supplied drawings between Lake Highland Substation and the riser structure 7-1737-114. Bidders will have the option to submit a proposal for both the 115 kV and 230 kV transmission projects, must meet all the requirements and specifications or submit a proposal for one or the other. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |