Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Fire Station 41 Reconstruction - PB1823 - City Of Overland Park
Demolition, New Construction, Infrastructure
Conception
$13,000,000 CJ est. value
Overland Park, KS 66204

Mission Bowl Apartments Redevelopment
New Construction
Design
$29,000,000 est. value
Mission, KS 66205

Two Building Development
New Construction - 20,707 SF
Design
$500,000 to $1,000,000 CJ est. value
Overland Park, KS

Sidewalk Construction Project
Infrastructure
Bidding
$20,000 CJ est. value
Olathe, KS 66061

Veterans Park Memorial and Fishing Jetties
Infrastructure
Bidding
$1,000,000 CJ est. value
Spring Hill, KS 66083

Anderson Pointe
New Construction, Renovation - 75,624 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Olathe, KS

Aspen Lodge Apartments - Bldg 22
New Construction - 6,517 SF
Post-Bid
$734,857 est. value
Overland Park, KS 66204

Farmers' Market Pavilion Site
Infrastructure
Results
Overland Park, KS

Shawnee Mission School District Westridge Middle School Renovations and Addition
Addition, Demolition, Renovation, Infrastructure
Results
$1,785,953 CJ est. value
Overland Park, KS 66214

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Watercrest Mix-Use Development
New Construction
Pending Verification
Lenexa, KS 66250

Corporate Ridge Apartments
New Construction
Pending Verification
Olathe, KS

Neighborhood Park at 159th and Quivira - PR-1875 - City of Overland Park
New Construction, Infrastructure
Conception
$2,150,000 CJ est. value
Overland Park, KS 66204

Last Updated 10/13/2022 04:05 PM
Project Title

Tallgrass Apartments - Phase 3

Physical Address View project details and contacts
City, State (County) Gardner, KS 66030   (Johnson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Design Development, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $80,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the phased construction of a 596-unit multi-residential development with 991 parking spaces: Phase 1 consists of 184 units Phase 2 consists of 144 units Phase 3 consists of 268 units An architect has been selected and the developer will serve as the general contractor. Subcontractor bidding will be handled privately and by invitation only. Inquiries will not be accepted. Phase 3 is not expected to commence prior to summer 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents