Similar Projects
Public Safety Admin Building Locker Room Improvements
Renovation
Conception
$1,181,953 est. value
Peoria, AZ 85345

79th Encanto Multifamily and Senior Living
New Construction
Design
Phoenix, AZ 85035

Kyrene Traditional Academy Restroom Renovation
Renovation
Design
$500,000 est. value
Chandler, AZ 85226

Smith Park Recreation Center Operation
Term Contract
Post-Bid
Phoenix, AZ 85009

Student Playground Renovations
Renovation
Post-Bid
Chandler, AZ 85224

Recreation Amenity on 5 Acres Regional Park
Results
Gilbert, AZ 85296

Edison Park Activity Hub Design-Bid-Build Project
Results
Phoenix, AZ 85003

Fiesta Village Mixed Use Development
New Construction - 80,200 SF
Construction
Mesa, AZ 85210

Talking Stick Resort Arena
Renovation
Construction
Less than $234,900,000 est. value
Phoenix, AZ 85004

Food Innovation Center - Master Plan
New Construction
Pending Verification
$200,000,000 est. value
Phoenix, AZ 85040

Laveen Spectrum
New Construction
Pending Verification
Phoenix, AZ 85339

Kyrene de los Lagos Dual Language Academy Restroom Renovation
Renovation, Addition
Design
$600,000 est. value
Phoenix, AZ 85048

Splash Pad and Spray Pad Parts, Repair and Replacement Services
Term Contract
Post-Bid
Phoenix, AZ 85003

DEMA M5101 Air Guard Latrine (M20-0015) Single
Results
Less than $100,000 est. value
Phoenix, AZ 85008

Monte Vista Village Resort
Renovation - 1,283 SF
Construction
$75,043 est. value
Mesa, AZ 85209

Last Updated 08/18/2021 09:42 AM
Project Title

30 Acre Community Park North Zone

Physical Address View project details and contacts
City, State (County) Buckeye, AZ   (Maricopa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Park/Playground, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Schematic Drawings
Bids Due View project details and contacts
Estimated Value $2,465,340
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Potential concepts include, but is not limited to, a lake, splash pad, playground, sports fields and courts, restroom, ramadas, and parking. The scope of the work includes site infrastructure, utilities, off-site improvements for access to the park, grading and drainage, and construction of the park.

Details

Athletic Facility, New Construction, Restroom/Bath House, New Construction, Park/Playground, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents