Similar Projects
Influent Screw Pump Replacement, Phase 1
Alteration
Bidding
$3,300,000 est. value
Clinton, MA 01510

Fy22 Osterville Field Irrigation Well Project
Infrastructure
Bidding
$25,000 est. value
Barnstable, MA

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Low-Pressure Sewage Pump Systems
Results
Orleans, MA

2019 Municipal Well and Pump Rehabilitation
Results
$150,000 est. value
West Yarmouth, MA 02673

Cleaning of Sewer Pump Station Wet Wells
Term Contract, Infrastructure
Bidding
North Andover, MA

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Heather Row Grinder Pump (Furnish and Install)
Results
$225,000 est. value
Tewksbury, MA

Dewatering Pump Restoration and Maintenance Service, Diesel Powered
Post-Bid
Charlestown, MA

GP 1 Replacement Well Implementation - General Bids
Results
$350,000 est. value
Seekonk, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Replacement of Evergreen Well 3
Results
Natick, MA 01760

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

B11 Well Pump Replacement
Results
$18,412 est. value
Springfield, MA

Reported 08/10/2021 10:58 AM
Project Title

Installation of Irrigation Wells and Pumping Systems

Physical Address View project details and contacts
City, State (County) Newburyport, MA   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $38,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Three irrigation wells drilled in 2-3 locations in the City and the installation of 3 pump systems to produce 50 GPM@75PSI to include tasks and all supplies needed to complete the scope of work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents