Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Storm Drainage for East Campus of Central Wisconsin Center
Infrastructure
Bidding
Madison, WI 53704

Storm Drainage for West Campus of Central Wisconsin Center
Infrastructure
Bidding
Madison, WI 53704

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Site Utility Steam Distribution Replacement -GPC
Infrastructure
Bidding
$4,300,000 est. value
Madison, WI

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Site Utility Steam Distribution Replacement - MEP
Infrastructure
Bidding
$4,300,000 est. value
Madison, WI

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Drainage Improvements - Lower Maugh`s Creek and Milwaukee Street
Infrastructure
Bidding
Mauston, WI 53948

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Last Updated 05/19/2021 09:35 AM
Project Title

Honey Creek Road Culvert Replacement

Physical Address View project details and contacts
City, State (County) WI 54904   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of culvert replacement project under Honey Creek Road along Honey Creek. The project includes removing twin 72-inch CMP culverts with concrete headwalls and replacing with a pre-cast 12-foot x 6-foot concrete box culvert with cast-in-place concrete headwalls, including associated restoration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents