Similar Projects
LOR-CR639-0.84 - Case Rd Bridge #0083 Replacement
New Construction, Infrastructure
Bidding
$516,107 est. value
Avon, OH 44011

Bridge Repair - CHP-BH-FY22
New Construction, Infrastructure
Bidding
$650,000 est. value
OH

Jefferson WWTP Bridge Replacement Project
New Construction
Post-Bid
Jefferson, OH

Elk Creek Metropark Sebald Park Bridge Improvements
Results
Less than $142,237 est. value
Hamilton, OH 45042

Bridge Replacement (1 Bridge) - Elizabeth Street Bridge
Results
OH

Bridge Replacement
New Construction, Infrastructure
Bidding
$778,556 est. value
OH

MOT-FRMP Deeds Point Bridge Project
Results
Less than $2,517,029 est. value
Dayton, OH 45422

Bridge Repair - CHP/SHE-VAR/VAR
New Construction, Infrastructure
Bidding
$1,146,000 est. value

Furnishing One Galvanized Steel Bridge on Chapel Creek Road (T.R. 234)
Results
Less than $69,495 est. value
Massieville, OH 45601

Bridge Repair - SR 315-04.15
New Construction, Infrastructure
Bidding
$401,000 est. value
Columbus, OH

Bridge Repair - SR 125-03.78
Results
OH

Bridge Repair - TUS-US 250-12.32
New Construction, Infrastructure
Bidding
$679,011 est. value
OH

Bridge Repair - SR 707-16.97
Results
OH

Bridge Replacement - SR 151-04.85
New Construction, Infrastructure
Bidding
$6,790,000 est. value
OH

Hamilton Beltline Phase I
Results
Hamilton, OH 45011

Last Updated 02/09/2022 04:28 PM
Project Title

Removal of the State Road Bridge

Physical Address View project details and contacts
City, State (County) Delphos, OH   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is for the removal of the State Road Bridge No. ALL-CR 84-6.49, over the Auglaize River in Marion Township; Allen County, Ohio; the replacement of the said bridge with a three (3) span, prestressed concrete composite box beam superstructure (spans being 50’-4 7/8”, 65’-0”, 50’-4 7/8” with a 20° right forward skew) on existing abutments and reinforced concrete wall piers founded on spread footings founded in rock; 32’-0” f/f guardrail; and construction of all approach work including grading, paving and construction of all necessary drainage facilities. The project length is approximately 500 linear feet.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents