Similar Projects
Apple Valley Subdivision
New Construction
Conception
Rapid City, SD 57703

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Replace Str Bridge, Approach Grading, PCC Surfacing, Concrete Barrier, Approach Slabs, Guardrail, Lighting
Demolition, New Construction, Infrastructure
Design
$6,084,000 CJ est. value
Rapid City, SD 57701

Water and Sewer Improvements Block 13 Boulevard Addition
Infrastructure
Bidding
$550,000 CJ est. value
Rapid City, SD 57701

MicroSurfacing and Asphalt Concrete Patching
Infrastructure
Bidding
$3,220,000 CJ est. value
New Underwood, SD 57761

RFP D/B - Architectural and Engineering Services, Mineral Industries Building
New Construction, Infrastructure
Post-Bid
$34,000,000 CJ est. value
Rapid City, SD 57701

RFQ D/B - B21 Fuels Construction Contract
Demolition, New Construction, Infrastructure - 7,244 SF
Post-Bid
$100,000,000 CJ est. value
Rapid City, SD 57703

Sioux Park Tennis Courts Reconstruction
Infrastructure
Results
$3,114,910 CJ est. value
Rapid City, SD 57702

Runway 12-30 Reconstruct, Extend and Widen
Infrastructure
Results
$5,712,442 CJ est. value
Wall, SD 57790

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Rushmore Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Rapid City, SD 57701

Rushmore Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Rapid City, SD 57701

Shoulder Widening, Pipe Work, Spot Grading; Replace Str (RCBC), Approach Grading
Infrastructure
Conception
$28,834,000 CJ est. value
Rapid City, SD 57702

Last Updated 01/10/2023 03:40 PM
Project Title

Diamond Ridge Subdivision

Physical Address View project details and contacts
City, State (County) Rapid City, SD 57701   (Pennington County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of site work and construction of two residential buildings. As of January 10, 2023, preliminary subdivision plan for proposed lots 1 and 2 of block 5 have been recommended for approval. A general contractor has been selected, but not announced. A timeline for construction has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents