Similar Projects
Airport West Sanitary Sewer Collection
Renovation, Infrastructure
Post-Bid
Sebastian, FL

Lift Station M-16 Replacement
New Construction
Post-Bid
FL

Lift Station No. 38
New Construction
Results
$98,819 est. value
Melbourne, FL 32901

West Cocoa Wastewater Improvements Phase 1
Results
$3,164,000 est. value
Melbourne, FL 32940

Lift Station S-19 Replacement
Renovation
Construction
$1,385,422 est. value
Melbourne Beach, FL 32951

Submersible Pumps and Wastewater Lift Stations
New Construction
Results
Cocoa, FL 32922

Lift Station T-27 Rehabilitation
Results
Melbourne, FL 32940

Lift Station S-14 Upgrade
New Construction
Results
$100,000 est. value
Indian Harbour Beach, FL 32937

Lift Station No. 8 Rehabilitation
New Construction
Results
$286,170 est. value
Cape Canaveral, FL 32920

Water Inflated Cofferdam - Unit 2 Pump Station
New Construction
Results
$80,000 est. value
Palm Bay, FL

Lift Station No. 1 Replacement Project
New Construction
Results
Cocoa, FL 32922

Lift Station 26 Rehabilitation
Renovation
Results
$69,025 est. value
Palm Bay, FL 32905

Lift Station S-16 Rehabilitation
Renovation
Results
Indian Harbour Beach, FL 32937

Lift Station 21 Rehabilitation
Renovation
Results
$123,504 est. value
Palm Bay, FL 32905

Lift Station No. 46
New Construction
Results
Melbourne, FL 32904

Last Updated 03/04/2022 08:15 AM
Project Title

Lift Station V-03 Replacement

Physical Address View project details and contacts
City, State (County) Merritt Island, FL 32952   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,690,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the demolition and replacement of existing Lift Station V-03. The scope of work includes but is not limited to: 1. Demolition of the two (2) existing wet wells, two (2) existing valve vaults and the contents inside, one (1) electrical building, three (3) sanitary sewer manhole structure, one (1) odor control unit, associated piping, valves, and support, and other appurtenances on site. Demolition of wet well and valve vaults shall include removal and disposal of all grit, sludge, and any accumulation inside. 2. Removal and salvage to Owner of the existing permanent standby generator, diesel storage tank, RTU, antenna, lighting panel, and MCC. 3. Replacement of the existing Lift Station V-03 includes installation of a new wet well, above grade discharge piping, valves and associated pipe supports, two (2) submersible pumps, risers, piping, electrical pump control panel, permanent backup diesel pumps, RTU, pump control panel, station disconnect, utility meter, associated electrical and telemetry components, backup float control, submersible pressure transducer, and the associated instrumentation and controls

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents