Similar Projects
Greenbrier Nursing & Rehabilitation Center Faulkner Co
Renovation, Infrastructure
Design
$1,000,000 CJ est. value
Greenbrier, AR 72058

Dry Bores for Conway Corporation
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR

Connecting Hallways/Safe Areas at Elementary School
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Enola, AR 72047

Vilonia Church St. Sidewalks
Infrastructure
Results
$1,675,490 CJ est. value
Vilonia, AR 72173

Runway 4-22 Rehabilitation (Joints and Markings)
Infrastructure
Results
$345,657 CJ est. value
Conway, AR 72034

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

Donaghey Avenue Multi Family Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Conway, AR 72034

Donnell Ridge Pump Station Coating Repair
Infrastructure
Post-Bid
Conway, AR 72034

Vilonia Waterworks Association Mount Vernon Pump Station
Infrastructure
Results
$624,155 CJ est. value
Vilonia, AR 72173

The Bird's Nest Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Conway, AR 72034

Conway Fire Station 03
New Construction, Infrastructure - 4,100 SF
Post-Bid
$500,000 CJ est. value
Conway, AR 72032

Garrett Road Improvements
Infrastructure
Results
$1,625,413 CJ est. value
Greenbrier, AR 72058

1600 Place PUD
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Conway, AR 72032

Railroad Basin Interceptor Replacement Phase 3
Infrastructure
Post-Bid
Conway, AR 72034

Chestnut Street Improvements Oak to College
Infrastructure
Post-Bid
$80,000 CJ est. value
Conway, AR 72032

Last Updated 07/03/2023 12:06 PM
Project Title

Greenbrier Wastewater Treatment Plant Improvement Project

Physical Address View project details and contacts
City, State (County) Greenbrier, AR 72058   (Faulkner County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions shall be directed to Kaleb Mack at wastewater@gogreenbrier.com and copied to Jerry Martin at jtmartin@garverusa.com. Contractors must directly contact Kaleb in order to obtain all information. The City of Greenbrier is seeking Statement of Qualifications consistent with Act 612 of the Arkansas 92nd General Assembly Regular Session 2019, from qualified licensed professionals who are certified by the Arkansas Contractors Licensing Board to perform construction management/ general contractor services for the Greenbrier Wastewater Treatment Plant Improvement Project in Greenbrier, AR. The project includes various improvements and additions to the Greenbrier Wastewater Treatment Plant, including upgrades to the screens, the addition of a grit chamber, modifications to pumping and electrical, a new backup generator, and addition of a new covered ultraviolet disinfection facility. Preconstruction services are anticipated to begin by July 2023. Construction must be completed by December 31, 2026, to meet ARPA funding requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents