Similar Projects
2 Million Gallon Hydropillar (South Water Tower) Painting And Repairs
Results
De Kalb, IL 60115

Fuel Storage Improvements
Results
Less than $831,650 est. value
Woodridge, IL 60517

CNG Fuel Station Maintenance
Term Contract
Results
Downers Grove, IL 60515

Removal of Underground Storage Tanks
Results
Rockford, IL 61109

Two Dri-Steam Gas to Steam Humidifiers
Post-Bid
Des Plaines, IL 60016

2020 Underground Storage Tank System Removal
Results
Warrenville, IL 60555

Installation of One (1) Above Ground Diesel Fuel Storage Tank
Results
Addison, IL 60101

2021 Lasalle County Highway Fuel
Term Contract
Post-Bid
Ottawa, IL

2021 Above Ground Fuel Tank
Term Contract
Post-Bid
Richton Park, IL

Rehabilitation of the 750,000 Gallon Spheroid High Tank
Results
Carol Stream, IL

Removal Of Underground Storage Units
Results
Rockford, IL 61109

Underground Fuel Storage
Post-Bid
Downers Grove, IL

Reported 10/06/2020 12:00 AM
Project Title

Natural Areas Maintenance and Controlled Burning Services

Physical Address View project details and contacts
City, State (County) Half Day, IL 60069   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The undersigned agrees that the contract shall be for a one year period, but shall provide that it can be extended, on an annual basis, at the option of the Village of Lincolnshire in its sole and absolute discretion, for up to two additional years, on the terms in the bid document submitted in response to the request for proposal. The proposed project is to provide Natural Area Maintenance including Herbaceous/Invasive Weed Control and Controlled Burning Services of selected Village natural areas located in Lincolnshire Illinois. The areas consist of Florsheim, North Park and Old Mill Additions to Florsheim Nature Preserve, Spring Lake Park and Lincolnshire Village Hall. All locations are within the Village of Lincolnshire.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents