Similar Projects
Lock Control System Modernization, Lock and Dam #5, Allegheny River, Freeport, PA
Renovation
Design
$500,000 to $1,000,000 est. value
Freeport, PA

Sand Spring Run Dam Repairs
Renovation
Bidding
$100,000 to $500,000 est. value
PA

Central Business District Tunnel Lighting and Conduit Replacement
Post-Bid
Pittsburgh, PA 15222

FE Walter Dam, White Haven - PA, Inspection and Repair of Right Service Gate in Tower
Post-Bid
$250,000 to $1,000,000 est. value
White Haven, PA 18661

Marquette Lake Dam - Improvements to Marquette Lake Dam
Results
Less than $8,500,000 est. value
Harrisburg, PA

Dam Rehabilitation - Construction - Hibernia Dam, Chester, PA
Results
$500,000 to $1,000,000 est. value
PA 19320

Repair of Lake Swiftwater Dam
Renovation
Post-Bid
Henryville, PA 18332

Meadow Grounds Lake Dam
Results
$2,000,000 to $5,000,000 est. value
McConnellsburg, PA

Bushkill Dam Removal and Stream Restoration Project
Renovation, Demolition
Post-Bid
Easton, PA

Stilling Basin Repair, Foster Joseph Sayers Dam, Beech Creek, PA
Results
$1,000,000 to $5,000,000 est. value
Beech Creek, PA 16822

Beach Creek Dam
Post-Bid
Less than $25,000 est. value
State College, PA 16801

Stoplog & Bulkhead Fabrication, Delivery, Installation and Testing
Results
Leesport, PA

Lower Woods Pond - Renovate Dam
Infrastructure
Post-Bid
$2,000,000 to $3,000,000 est. value
Honesdale, PA 18431

Mulitple Locations - Dam Rehabilitation Project
Results
Less than $15,075,000 est. value
PA

Central Business District (CBD) Tunnel Plinth Rehabilitation
Infrastructure
Post-Bid
Less than $20,000,000 est. value
Pittsburgh, PA

Reported 06/25/2021 12:00 AM
Project Title

General Edgar Jadwin Dam Safety Modification

Physical Address View project details and contacts
City, State (County) Honesdale, PA 18431   (Wayne County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contract work will consist of the installation of a geosynthetic liner system along the upstream face of the dam and onto its upstream berm. The liner system will be installed below the upstream armoring riprap, in contact with the embankment material and will be 400’ wide, extending from the dam crest, down the entire upstream face of the dam, and approximately 200’ onto the upstream earthen berm. The existing upstream armoring riprap will be removed, stockpiled, and material suitable for reuse will be installed following the liner installation.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents