Similar Projects
US 395/Kennewick - W 19th Ave Noise Walls
Infrastructure
Conception
$2,851,000 CJ est. value
Kennewick, WA 99336

US 395/Kennewick - W 19th Ave Noise Walls
Infrastructure
Conception
$2,851,000 CJ est. value
Kennewick, WA 99336

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,166,000 CJ est. value
Benton City, WA 99320

US 730/5.2 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,166,000 CJ est. value
Benton City, WA 99320

Community Housing Development Organization (CHDO) Affordable Housing Development
New Construction, Infrastructure
Bidding
$425,050 CJ est. value
Richland, WA 99352

RFQ Contractor - Construction of Hop Picker Building
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Prosser, WA 99350

Zone 3 West Transmission Main
Term Contract, Alteration
Post-Bid
Kennewick, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

2022 Bituminous Surface Treatment
Infrastructure
Results
$350,000 to $400,000 est. value
Kennewick, WA

I-82, Coffin Rd Vicinity Paving
Infrastructure
Results
$400,000 to $500,000 est. value
WA

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

X-Energy Reactor Nuclear Plant - Tri-Energy Partnership
New Construction, Infrastructure
Pending Verification
$2,400,000,000 CJ est. value
Richland, WA 99352

I-82/Columbia River Bridge at Umatilla EB - Bridge Painting Stage 2
Infrastructure
Conception
$20,376,000 CJ est. value
Kennewick, WA 99338

US 730/3.0 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$1,738,000 CJ est. value
Kennewick, WA 99337

Wastewater Treatment Plant (WWTP) Non-Potable Water System
Infrastructure
Bidding
$988,091 CJ est. value
Kennewick, WA 99336

Last Updated 06/02/2023 09:39 AM
Project Title

Deschutes Avenue and Columbia Center Blvd. Intersection Improvements

Physical Address View project details and contacts
City, State (County) Kennewick, WA 99336   (Benton County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of constructing a new traffic signal system to accommodate a new right-turn lane for added turning capacity for west-bound traffic turning northbound onto Columbia Center Blvd. In addition, the proposed work will require the installation of a roundabout at Colorado St. and Deschutes Ave. The proposed work includes the installation of curb, gutter, sidewalk, traffic curbing, concrete traffic islands, retaining walls, driveways, storm drainage, utility trench excavation, landscape and irrigation restoration, HMA patching and overlay, striping, signage and a new signal system. Along Deschutes Ave the entire intersection at Columbia Center Blvd and at Colorado St. will be overlaid with hot mix asphalt and restriped. This proposed work will be in preparation to widen Columbia Center Blvd north of Deschutes Ave, adding a 3rd lane for northbound and southbound through traffic on Columbia Center Blvd to Quinault Ave. Majority of signal components including poles, mast arms, heads, controller cabinet and street light poles and luminaires have been pre-purchased and stockpiled at the City shops. This project is funded by State Transportation Improvement Board (TIB) dollars. Therefore, no Disadvantaged Business Enterprise or Training goals are required for this contract work. The City will post any Addenda and Bidder questions & answers solely through Public Purchase. The City cannot guarantee receipt of all bidder documentation to outside third-party centers. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Kennewick_ The City of Kennewick reserves the right to waive any informalities or to reject any or all bids. For questions or additional information, please call 509-585-4287.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents