Similar Projects
Reported | 10/29/2021 12:00 AM |
Project Title | Civil Works Design - Build Project Creek Bank Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Allen, TX 75013 (Collin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $400,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | First Site Visit on 10/12/2021 at 9:00 AM at Watters Creek site first then move to Cottonwood Creek Address: 1. Cottonwood Creek Location 301 – 399 E. Exchange Parkway Allen, Texas 75002. 2. Watters Creek Location 1070 Watters Creek Blvd Allen, Texas 75013. Second Site Visit on 10/15/2021 at 11:00 AM at Watters Creek site first then move to Cottonwood Creek Address: 1. Cottonwood Creek Location 301 – 399 E. Exchange Parkway Allen, Texas 75002 2. Watters Creek Location 1070 Watters Creek Blvd Allen, Texas 75013. Scope of Work: The projects locations a re in the main channels of Cottonwood and Watters Creeks. The goal of the RFQ is to select a design -build firm “TEAM” to construct an engineered solution to prevent/stop erosion around adjacent infrastructure to include but not limited to bridge abutments, sidewalks / trails, headwall , and water / sewer mains generally shown on the two attached exhibits. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |