Similar Projects
US 93/Interstate 40 - West Kingman Traffic Interchange - Phase 2 - Arizona Department of Transportation (AZDOT)
Alteration
Conception
$41,000,000 est. value
Kingman, AZ 86401

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

(1-11 Project) Airway Avenue - Prospector Street to Rancho Parkway and (1-11 Project) Rancho Santa Fe Parkway TI Phase 1
Infrastructure
Design
$5,655,000 CJ est. value
Kingman, AZ 86401

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Rotary Park Restroom
New Construction, Infrastructure
Results
$129,375 CJ est. value
Bullhead City, AZ 86442

Topock - Kingman Highway (I 40) (Ca Border - Mp 2.54)
Infrastructure
Results
$956,000 CJ est. value
Kingman, AZ 86401

16-2, 18-1 and 18-2 Lift Stations Wet Well Rehabilitations - 18-E-012 - City of Bullhead City
Infrastructure
Pending Verification
$630,000 CJ est. value
Bullhead City, AZ 86429

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

I-11 Kingman Crossing Traffic Interchange - City of Kingman
Infrastructure
Conception
$31,500,000 CJ est. value
Kingman, AZ 86401

I-11 Rancho Santa Fe TI - City Of Kingman
Infrastructure
Design
$48,817,815 est. value
Kingman, AZ

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Dick Samp Park Pickleball Courts - Phase 3
Infrastructure
Results
$96,117 CJ est. value
Lake Havasu City, AZ 86404

Tesoro Townhouses
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Lake Havasu City, AZ 86406

Last Updated 10/06/2023 12:00 PM
Project Title

System Enhancement (Engineering)

Physical Address View project details and contacts
City, State (County) Kingman, AZ 86409   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,124,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

0000 Mo Mm0 T027201c Mm0-0-(223)t Mohave County (Northern Ave- Stockton Hill Rd) Northwest District Item # 100499 Engineering Specialist: Zarghami Ata Pre-qualification: Yes Bid Opening: 10/20/2023 11:00:00 Am The proposed project is located in Mohave County, at the north boundary of the City of Kingman within the Mohave County jurisdiction. The project is located along Northern Avenue between Stockton Hill Road and Castle Rock Road. The work includes constructing concrete sidewalks and driveways, replacing pavement markings, installing a new traffic signal video detection camera, and other related work. AZDOT - System Enhancement (Engineering)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents