Similar Projects
Proposed Paving and Storm Water Facilities to serve Davenport Parkway and Discovery Drive at Alvin ISD
Bidding
TX

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Riverstone Ranch at Clear Creek, Sections Fifteen and Sixteen
Bidding

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Storm Sewer, Sanitary Sewer, Water Line Mitigation Basin, and Storm Sewer Pump Station to Serve Mustang Ridge Sections One and Two
Post-Bid
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Del Bello Section 1
Results
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 6
Results
TX

Water, Sanitary Sewer, Drainage Facilities and Paving and Appurtenances to Serve Caldwell Ranch Section 5
Bidding

Sierra Vista West Section 6 - Water, Sanitary, and Drainage
Post-Bid
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 5
Results
TX

Water and Drainage Facilities to Serve Post Road Street Dedication Section 1
Bidding
TX

High Density Polypropylene Storm Sewer Pipe Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Water, Sanitary Sewer, and Drainage Facilities to Serve Pollard Boulevard Phase 2
Results
TX

Bridgeland Parkland Village Section 57 Water Distribution System, Sanitary Collection System, Storm Drainage System, and Street Paving
Bidding
Houston, TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Core Drilling Services
Results

Last Updated 04/13/2021 09:31 AM
Project Title

Chocolate Bayou Detention Phase Three (Basin T Phase One) and Earthwork to Serve Meridiana

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 78 acres of light clearing, 121,000 CY of detention pond excavation, 1,000 LF of 30” to 42” RCP and 6'(W) x4'(H) RCB storm sewer.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents