Similar Projects
Trigg Hall Renovations
Renovation
Conception
$1,489,020 est. value
Princess Anne, MD

Hood College Brodbeck Hall
Renovation
Conception
Frederick, MD 21701

Agora Institute
New Construction - 38,000 SF
Design
Baltimore, MD 21211

Health and Human Services Center
Design
Baltimore, MD 21251

CMREC Headquarters Design Bid/Build
New Construction
Bidding
Ellicott City, MD 21042

Sherman Hall Renewal Project
Renovation
Bidding
$72,800,000 est. value
Baltimore, MD 21250

Glen Towers Facade and Plaza Improvements at Towson University
Renovation - 402,700 SF
Post-Bid
$7,203,541 to $58,160,000 est. value
Towson, MD 21252

Modular Construction Temperature and Humidity Test Chambers
Post-Bid
$500,000 to $1,000,000 est. value
College Park, MD 20742

Synthetic Running Track Surfacing
Results
$400,000 est. value
Saint Marys City, MD 20686

PEC Sports Complex Restroom
New Construction - 800 SF
Results
$500,000 to $1,000,000 est. value
Baltimore, MD

Johns Hopkins University School of Nursing
New Construction, Renovation - 66,000 SF
Construction
$45,000,000 est. value
Baltimore, MD 21205

FSU - Education And Health Sciences Building
New Construction - 100,000 SF
Construction
Less than $79,000,000 est. value
Frostburg, MD

Stop Motion Animation Studio
New Construction
Pending Verification
Bowie, MD

Design/Build Contract Agriculture Research and Education Center UMES
- 16,200 SF
Design
Less than $14,000,000 est. value
Princess Anne, MD

Rare Book Archive & Workroom
Renovation - 2,422 SF
Post-Bid
College Park, MD 20740

Last Updated 10/14/2021 11:39 AM
Project Title

Construction Services for Mitchell Laboratory Renovation on the Campus of Morgan State University

Physical Address View project details and contacts
City, State (County) Baltimore, MD 21250   (Baltimore County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Patch any holes created in walls. 2. Repaint all rooms (colors) to be specified. 3. Patch floors if necessary with VCT (color to be specified) / clean/wax floors). “Square up” any floor patches (from around removed lab tables and other locations as necessary) for VCT. 4. Dispose of any removed items unless otherwise indicated. 5. Safe off / cap all utilities in/at wall, floor and ceilings unless otherwise indicated. Electric boxes in open floor area should if possible be put in to a floor box to prevent a tripping hazard. Utilities in the walls are to remain. 6. Connections to meet current codes.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents