Similar Projects
Equus Wellfield Spurline Replacements Phase III
Infrastructure
Bidding
$150,000 est. value
Wichita, KS

Groundwater Monitoring Well Sampling for Wellfield
Infrastructure
Post-Bid
Wichita, KS

SWS 758 Pump Station 7 and 9 Repairs
Renovation
Post-Bid
Wichita, KS

Pump Station 4 Force Main Realignment
Renovation
Results
$500,000 to $600,000 est. value
Kansas City, KS

Cedar Mill Pump Station Force Main Replacement
Renovation
Results
Olathe, KS

2021 Main Lift Station and Forcemain Improvements
New Construction
Post-Bid
$1,820,000 est. value
Eudora, KS

Kansas River Flood Protection Project Well 18 Abandonment
Infrastructure
Results
Manhattan, KS

Direct Replacement of Aurora Pumps at City Hall
Infrastructure
Post-Bid
Lawrence, KS

Lakeside and Simmons Sewer Pump Station Improvements
Renovation
Results
Augusta, KS

Wilson Relief Well Project
Alteration
Post-Bid
KS

Lift Station No. 2 Improvements
New Construction
Results
Emporia, KS

Replacement of Sump Pump and Monitoring Systems
Alteration
Post-Bid
Less than $25,000 est. value
Topeka, KS 66612

199th and Webster Pump Station and Force Main
Renovation
Results
Spring Hill, KS

SWS 762 Phase 1 Pump Station 6-9 Repairs
Renovation
Post-Bid
$200,000 est. value
Wichita, KS

Water System Improvement
Infrastructure
Results
Nortonville, KS

Last Updated 06/07/2022 11:16 PM
Project Title

Vermillion New Source of Supply

Physical Address View project details and contacts
City, State (County) Vermillion, KS   (Marshall County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of WORK are included in TWO (2) CONTRACTS, A and B. Contract A includes installing two new water wells, abandonment of two existing water wells, well pumps and piping, well house with meter/control room, separate chemical feed room, controls/ communication systems and equipment, emergency generator with automatic transfer switch, fencing, electrical work, supply and distribution piping approximately 4,040 If of 6" C-900 PVC, connections to new water tower, existing waterlines, pig launching and receiving pits, approximately 900 If of 1" and 2" PE service line, 19 valves, 11 service connections, 14 meter pits with ARM meters and new ARM system, 3 fire hydrants, waterline connections and abandonments as required, site/surfacing restoration, erosion and traffic control, and all other work for a complete and operating as intended system. Contract B includes the design and erection of a new welded steel 35,000 gallon elevated potable water storage tank, complete with foundation, piping, electric mixer, connection to other piping work, electrical, relocating the EMS antenna and equipment from the existing water tower to the new water tower; decommissioning, removal and disposal of the existing water tower, site clean up, and any and all other items for a complete and operating as intended system

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents