Similar Projects
Wastewater Pump Station Improvements
Design
North Bay Village, FL

Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

District II - Robena Road Booster Pump Station
Bidding
Jacksonville, FL 32218

Bayshore Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $3,500,000 est. value
Tampa, FL 33602

Sulphur Springs Pumping Station Rehabilitation Design-Build
Post-Bid
Less than $16,800,000 est. value
Tampa, FL 33602

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Rehab of LS 54 and LS 65
Renovation
Bidding
Clearwater, FL 33759

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Pump Stations Controls Upgrade and Maintenance
Results
Less than $60,000 est. value
Weston, FL 33326

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Lift Station Maintenance and Repair
Bidding
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Last Updated 03/11/2021 05:30 AM
Project Title

LPGA Lift Station 97 Rehabilitation

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $714,510 to $924,660
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of furnishing all coordination, labor, materials and construction services to complete the project work as noted in the Drawings. The primary work includes construction. This project involves the rehabilitation of the City’s Lift Station #97 by conversion of a top mounted style to submersible pumps. Work includes removal of existing hardware and installation of new pumps, rails, pipes, controls, backup diesel pump, wet well and manhole lining, new valve vault, fencing and electrical equipment.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents