Similar Projects
Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Magnolia Springs Wastewater Treatment Plant Phase 1 0.20 MGD
New Construction
Bidding
TX

Martinez II WWTP Aerator Replacement
New Construction
Bidding
San Antonio, TX

Toledo Bend Frontier Park WWTP Improvements
Post-Bid
Burkeville, TX 75932

0.120 MGD Wastewater Treatment Plant Project
Post-Bid
Woodloch, TX 77385

Wastewater Treatment Plant Phase 1
Results
Less than $2,139,671 est. value
TX

Salitrillo Wastewater Treatment Plant Progressive Design Build Upgrades
Results
Less than $25,000,000 est. value
San Antonio, TX 78204

Northwest Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Oakwilde Wastewater Treatment Facility Expansion to 0.7 MGD
Addition
Bidding
Houston, TX

Waste Water Treatment Facility - Conversion to Liquid Chlorine
Post-Bid
Houston, TX 77001

Wastewater Bar Screens for Houston Public Works
Results
Houston, TX 77013

0.30 MGD Package Wastewater Treatment Plant
Renovation
Bidding
TX

Roberto R. Bustamante Wastewater Treatment Plant - Digester No. 2 Rehabilitation
Post-Bid
El Paso, TX 79925

Last Updated 10/22/2021 06:14 AM
Project Title

Hankamer - 0.3 MGD Wastewater Treatment Plant Project

Physical Address View project details and contacts
City, State (County) Hankamer, TX   (Chambers County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall provide for the construction of a 0.3 MGD packaged wastewater treatment facility located in Hankamer, TX. This contract shall also provide for all necessary appurtenances required for a complete wastewater treatment facility as shown in the plans and specifications, including but not limited to, the chlorine disinfection system, non-potable water system, electrical & controls, stand-by generator, site foundation, concrete slabs, and site work.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents