Similar Projects
Lakeview Centennial High School HVAC Ductwork Replacement
Bidding
$550,000 est. value
Garland, TX 75043

HVAC Air Handling Units Replacements
Bidding
Dallas, TX

Replacement Exhaust Systems at New Baker and New Hampton Pump Stations
Post-Bid
Dallas, TX 75201

Heat Exchanger Replacement
Post-Bid
Irving, TX 75062

Dedicated Outside Air Units
Results
$320,420 est. value
Mesquite, TX

65--Steam Sterilizers - Removal, Installation and Maintenance Sources Sought Notice
Results
Dallas, TX

Addison Airport Toll Tunnel Exhaust Fan Replacement
Bidding
Addison, TX

Fire Station Vehicle Exhaust Removal and Filtration System
Post-Bid
Addison, TX 75001

HVAC Replacement at 2422 Butler Street
Results
Dallas, TX 75235

Roofing Services and HVAC Upgrades Summer 2020
Post-Bid
Mesquite, TX 75149

MLP8 HVAC and BMS Upgrade
Results
$296,830 est. value
Dallas, TX 75287

HVAC Compressor and Ducting Replacement
Post-Bid
Irving, TX 75062

Replacement of Self-Contained Air Handling Unit and Heat Exchanger at Pump Station 13
Results
Dallas, TX 75212

FY20 HVAC Maintenance and Service
Term Contract
Post-Bid
Arlington, Bonham, Carrollton, Cleburne, Corsicana, Dallas, Decatur, Denton, Duncanville, Ennis, Fort Worth, Granbury, Grand Prairie, Greenville, Hurst, Irving, Kaufman, Lake Worth, Lewisville, McKinney, Mesquite, Mineral Wells, North Richland Hills, Plano, Richardson, Sherman, Stephenville, Terrell, Watauga, Waxahachie, Weatherford, TX 76103

Mechanical Maintenance
Results
$1,000,000 to $1,500,000 est. value
Dallas, TX 75211

Last Updated 01/15/2020 01:04 PM
Project Title

HVAC Refurbishing Fire Admin Building

Physical Address View project details and contacts
City, State (County) Irving, TX   (Dallas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope for AHU Refurbishing: 1. Refurbish two (2) air handling in the facility according to the specifications 2. Each air handler and the options should be priced separately. 3. All bidding licensed contractors must agree to work after normal business hours and weekends. 4. Once refurbishing on an AHU has begun, it must be completed without interruption. You cannot start the project one day, break and complete at a later date. 5. All contract HVAC technicians must comply with City Hall rules and regulations defined by the Facility Operations Supervisor. 6. All applicable permits must be obtained through the City of Irving Inspections Department. There are no fees for permits or inspections associated with this work. The contractor must be licensed to perform work in the City of Irving. 7. Insure that all paperwork required to stay with the equipment is attached and provide a book with the duplicate paperwork to the Facilities Operations Supervisor upon completion. 8. Include $6,000 for contingency for the entire project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents