Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Graham A Barden Elementary School HVAC
Alteration
Bidding
New Bern, NC 28562

J T Barber Elementary School HVAC
Alteration
Bidding
New Bern, NC 28562

Lighting and HVAC Updates for DLA
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

B4035 Repair Ductwork in Plating Shop Basement
Post-Bid
Less than $25,000 est. value
Cherry Point, NC

Replace HVAC Controls Phase III
Results
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Installation and Integration of Needlepoint Bipolar Ionization in HVAC Systems
Alteration
Results
New Bern, NC 28562

Modify Test Cell 1 for PTMS Heat Exchanger B137
Alteration
Bidding
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

B150 Repair HVAC Equipment Band Room Area
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Furnish and Install Commercial Kitchen Hood System
Alteration
Results
New Bern, NC

B4224 Install Oven Ventilation Stack, FRCE
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC

B4841 HVAC Modifications FRCE
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Cherry Point, NC

West Craven High School Gym HVAC Project
Alteration
Post-Bid
Vanceboro, NC 28586

Havelock High School Gym HVAC Renovations
Alteration
Post-Bid
Havelock, NC 28532

Graham A Barden HVAC Unit
Alteration
Post-Bid
NC

Reported 05/05/2022 12:00 AM
Project Title

Replace Air Header and Diffusers BNR Reactors WWTP

Physical Address View project details and contacts
City, State (County) Cherry Point, NC 28533   (Craven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes providing and replacing Air Headers and diffusers in BNR Train 2 at WWTP, and incidental related work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents