Similar Projects
Replace Roof/ Camp Williams
Alteration
Conception
$568,800 est. value
New Lisbon, WI

Replace the Shingles on the Salt Shed
Renovation
Design
$42,909 CJ est. value
La Grange, WI 53190

GPC Roof Replacement
Renovation
Bidding
$300,000 CJ est. value
Gordon, WI 54838

Glenwood Children Park Arch Repair
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Madison, WI 53711

Roof Replacement
Alteration
Post-Bid
$250,000 to $500,000 est. value
Racine, WI 53402

Senior Center
Alteration
Post-Bid
Jefferson, WI 53549

Roof Replacement
Alteration
Results
Prairie Farm, WI 54762

City Hall Roof Replacement
Alteration
Results
Rice Lake, WI 54868

Interpretative Center Roof Replacement Havenwoods State Forest
Renovation
Construction
$328,400 CJ est. value
Milwaukee, WI 53209

Roof Replacement - Baraboo Armory
Renovation
Construction
$499,000 CJ est. value
Baraboo, WI 53913

Sawyer County Courthouse BP 1
Post-Bid
Hayward, WI 54843

Steel Roof Installation
Alteration
Results
Dorchester, WI

Roof Replacement MEP
Renovation
Construction
$1,245,332 CJ est. value
Madison, WI 53706

Arlington Court 2nd Floor Roof Repair
Alteration
Post-Bid
Milwaukee, WI 53202

South Shore Fire Department Fire Station 10 - 9433 Northwestern Avenue Roof Replacement
Alteration
Results
Mount Pleasant, WI 53406

Last Updated 05/13/2023 07:05 AM
Project Title

Roofing and Metal Panels Replacement

Physical Address View project details and contacts
City, State (County) Ashland, WI 54806   (Ashland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,351,800 [brand] Estimate
Plans Available from Architect - 01/11/23
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 3, 2023 , no bids received for this project. No definite date for the rebid.** In general, the Project consists of exterior renovations at technical college building. Replace ballasted membrane roofing with EPDM roofing. Replace existing metal roofing with standing seam metal roofing. Replace metal wall siding. Lump-sum Bids will be received on a SINGLE PRIME CONSTRUCTION CONTRACT FOR THE ENTIRE WORK. The Project Drawings, Project Manual and other Bidding Documents may be examined at the following locations: AE's Office: HSR ASSOCIATES, INC. 100 Milwaukee Street La Crosse, WI 54603 608-784-1830 HSR Associates is responsible for distribution of addenda only to those who have requested project documents from HSR in formats described above. HSR Associates will make AutoCAD files available to the Contractor following award of contract. HSR Associates maintains a plan holder list. This list includes only those who have requested plans from HSR and those who have requested to be added our list. Bid Security in the amount of ten percent of the maximum amount of the Bid must accompany each Bid as described in the Project Manual, Instructions to Bidders. The Owner reserves the right to waive irregularities and to reject any or all Bids. Bids may only be withdrawn in accordance with the Project Manual, Instructions to Bidder Install approximately 250' of mobile rail in various locations on the rooftop. Install (2) step platforms.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents