Similar Projects
Timpview High School Replacement
New Construction, Demolition - 400,000 SF
Post-Bid
$115,000,000 est. value
Provo, UT 84604

ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Payson High School Rebuild and Maple Mountain High School Football Stadium and Track Renovation
Results
$90,000,000 est. value
Payson, UT 84651

CM/GC Mountain View High Diesel Mechanics Shop Remodel
Renovation
Results
Orem, UT 84057

Spanish Fork High School Rebuild
Construction
Spanish Fork, UT 84660

Mountain Sunrise Academy Charter School
New Construction - 40,096 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84043

Micron Middle School Seminary
New Construction
Pending Verification
Lehi, UT 84043

Lehi Indoor Tennis & Pickleball
New Construction
Pending Verification
Lehi, UT 84043

Spanish Fork High School Bid Package 1
Post-Bid
Spanish Fork, UT 84660

Usdb Springville Campus Portable Classroom Remodel
Renovation
Results
Less than $75,000 est. value
Springville, UT 84663

New Middle School for Alpine School District
New Construction
Construction
Less than $41,000,000 est. value
Lehi, UT 84043

Mountain View HS Diesel Shop Remodel
Renovation
Post-Bid
Orem, UT 84057

Cedar Valley High School - Site Modification and Asphalt for Modular Building
New Construction
Results
Eagle Mountain, UT 84005

CM/GC Westlake Driver`s Education Tower
Construction
Saratoga Springs, UT 84045

Premier Martial Arts
Renovation - 1,544 SF
Post-Bid
Pleasant Grove, UT 84062

Reported 06/04/2021 02:37 PM
Project Title

American Heritage Phase 1C And 2A

Physical Address View project details and contacts
City, State (County) American Fork, UT 84003   (Utah County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method
Project Status Building in Operation as of May 2021
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Middle/Senior High School, 2 Stories Above Grade, 29,894 SF New Construction, 1 Athletic Facility, 1 Story Above Grade, 56,234 SF New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents