Similar Projects
The Preserve Phase 4
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Sherman, TX 75090

Mcgee Street Bridge - Erosion and Overlay Repairs - City of Sherman
Infrastructure
Conception
$900,000 CJ est. value
Sherman, TX 75092

Heritage Ranch - Phase 2-4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Sherman, TX 75092

Freedom Jeep Showroom Addition / Sherman
Addition, Demolition, Infrastructure - 9,887 SF
Design
$2,970,000 CJ est. value
Sherman, TX 75092

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Whitewright Nature Park Pond Renovation
Infrastructure
Bidding
$321,000 CJ est. value
Whitewright, TX 75491

Mass Grading Operations for Churchill
Infrastructure
Post-Bid
Van Alstyne, TX

Mantua Point Phase 2A and 2B Grading Package
Infrastructure
Post-Bid
Van Alstyne, TX

Chloramine Conversion and Take Point Improvements Project
Infrastructure
Results
Howe, TX

Whitewright Waterline Improvements
Infrastructure
Results
$752,421 est. value
Whitewright, TX

Home Place Partners - Gallagher Warehouse
New Construction, Infrastructure - 7,500 SF
Construction
$1,200,000 CJ est. value
Sherman, TX 75090

Classic Chevrolet Cadillac of Denison
New Construction, Infrastructure - 75,200 SF
Construction
$18,500,000 CJ est. value
Denison, TX 75021

Hampton Inn & Suites Sherman
New Construction, Infrastructure - 49,260 SF
Pending Verification
$6,000,000 CJ est. value
Sherman, TX 75092

QuikTrip #1915
New Construction, Infrastructure - 5,312 SF
Pending Verification
$725,000 CJ est. value
Sherman, TX 75090

Lamberth Road Expansion - Shady Oaks To Friendship Road - City of Sherman
Infrastructure
Conception
$4,600,000 CJ est. value
Sherman, TX 75090

Last Updated 02/11/2023 02:32 AM
Project Title

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to serve Churchill Pod 3 Phase 1

Physical Address View project details and contacts
City, State (County) Van Alstyne, TX 75495   (Grayson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,142,241 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 17, 2022, project was awarded to 3S Contracting, awarded amount is $1,142,240.72. Van Alstyne Municipal Utility District No. 3 of Collin County, Water Distribution, Sanitary Sewer and Storm Sewer Facilities to serve Churchill Pod 3 Phase 1". Project scope includes approximately 5,090 linear feet of 8" PVC Water Line, 4,425 linear feet of 8" PVC Sanitary Sewer Main, and 1,995 linear feet of 21"-42" Storm Sewer Pipe. Bids received after the closing time will be returned unopened. The total amount bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided and provide the required insurance certificates within 7 days after the date the Contractor is notified. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents