Similar Projects
Last Updated | 01/13/2022 04:23 PM |
Project Title | Union-Endicott CSD 2019 Capital Improvements Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Endicott, NY 13760 (Broome, Tioga Counties) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Sub-Bidding, Construction Commenced April 2021 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 to $4,600,000 |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | George F. Johnson Elementary: Project includes replacement of toilet flush valves and sink faucets. Linnaeus W. West School: Project includes masonry restoration, classroom toilet room refurbishment, gym wall replacement, vinyl asbestos tile replacement, cabinetry replacement, display boards, exhaust fan replacement, hose bibb replacement, grease interceptor replacement, emergency eye wash, drinking fountain replacement and kitchen renovation. Linnaeus W. West School Asbestos: Project includes asbestos abatement of floor tile. Charles F. Johnson Elementary: Project scope includes sanitary pipe replacement, masonry restoration, cafeteria refurbishment, cabinetry replacement, classroom toilet room refurbishment, exit discharge lighting, mixing valve replacement, kitchen renovation, library renovation and nurses office toilet room reconstruction. Senior High School: Project includes stadium bleacher replacement, exterior concrete stair replacement, ball field reconstruction, masonry restoration, gym floor refinishing, expansion joint replacement, pool filter replacement water distribution piping replacement, storm piping improvements, science room renovations, art room renovations and FCS room renovations. Jennie F. Snapp Middle School: Project includes locker room improvements including new lockers, finishes and HVAC improvements. T. J. Watson Elementary: Project includes pavement reconstruction, sidewalk reconstruction, cabinetry/sink replacement, toilet partition replacement, new drinking fountain and new mixing valve. Ann G. McGuinness Elementary: Project includes masonry restoration, cabinetry/sink replacement, toilet partition replacement and new drinking fountain. District Office: Project includes toilet room reconstruction and HVAC system improvements. Storage Building at Johnson ES: Project includes demolition of the existing building. Bradley Creek Bus Garage: Scope includes sanitary system replacement, concrete apron replacement, asbestos floor tile replacement, door replacement, wall reconstruction, electrical wiring replacement and fire alarm replacement. Walk-In Cooler/Freezer: Project includes a new walk-in cooler/freezer. Estimated Construction Budget: General Construction: $4,600,000; Mechanical Construction: $425,000; Electrical Construction: $725,000; Plumbing Construction: $1,800,000; Food Service Construction: $700,000; Asbestos Abatement No. 1: $500,000; Asbestos Abatement No. 2: $250,000; Casework Construction:$1,300,000. |
||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, New Construction.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |