Similar Projects
C-NS High School Renovations
Renovation
Conception
Cicero, NY 13039

Twin Towers Middle School Modernization
Renovation, Addition
Conception
Middletown, NY 10940

Salamanca CSD Improvements - Phase 3.3 and 3.4
Design
Salamanca, NY 14779

Batavia CSD 2020 - Vision Capital Improvement Project Phase 2 - 2021-2022 Capital Outlay Project
Renovation
Bidding
$2,200,000 est. value
Batavia, NY 14020

Mamaroneck UFSD - 2019 Bond Referendum - Capital Improvements at Mamaroneck High School - Phase 2
Renovation
Bidding
Mamaroneck, NY 10543

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

General Construction
Post-Bid
Albany, NY 12207

2018 Capital Project-Phase II
Results
Less than $2,500,000 est. value
Trumansburg, NY 14886

General Construction, Building Envelope and Restoration at Lincoln High School (DC)
Results
Yonkers, NY 10704

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Long Island City Charter School
Renovation - 23,820 SF
Pending Verification
$2,034,871 est. value
Long Island City, New York, NY 11101

Long Island City Charter School
Renovation - 23,820 SF
Pending Verification
$2,034,871 est. value
Long Island City, New York, NY 11101

Penn Yan CSD 2022 Capital Improvement Project - Phase 1
Renovation
Bidding
$250,000 to $8,500,000 est. value
Penn Yan, NY 14527

Westfield Academy Reconstruction
Post-Bid
Westfield, NY 14787

Last Updated 01/13/2022 04:23 PM
Project Title

Union-Endicott CSD 2019 Capital Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Endicott, NY 13760 (Broome, Tioga Counties)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Commenced April 2021
Bids Due View project details and contacts
Estimated Value $250,000 to $4,600,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

George F. Johnson Elementary: Project includes replacement of toilet flush valves and sink faucets. Linnaeus W. West School: Project includes masonry restoration, classroom toilet room refurbishment, gym wall replacement, vinyl asbestos tile replacement, cabinetry replacement, display boards, exhaust fan replacement, hose bibb replacement, grease interceptor replacement, emergency eye wash, drinking fountain replacement and kitchen renovation. Linnaeus W. West School Asbestos: Project includes asbestos abatement of floor tile. Charles F. Johnson Elementary: Project scope includes sanitary pipe replacement, masonry restoration, cafeteria refurbishment, cabinetry replacement, classroom toilet room refurbishment, exit discharge lighting, mixing valve replacement, kitchen renovation, library renovation and nurses office toilet room reconstruction. Senior High School: Project includes stadium bleacher replacement, exterior concrete stair replacement, ball field reconstruction, masonry restoration, gym floor refinishing, expansion joint replacement, pool filter replacement water distribution piping replacement, storm piping improvements, science room renovations, art room renovations and FCS room renovations. Jennie F. Snapp Middle School: Project includes locker room improvements including new lockers, finishes and HVAC improvements. T. J. Watson Elementary: Project includes pavement reconstruction, sidewalk reconstruction, cabinetry/sink replacement, toilet partition replacement, new drinking fountain and new mixing valve. Ann G. McGuinness Elementary: Project includes masonry restoration, cabinetry/sink replacement, toilet partition replacement and new drinking fountain. District Office: Project includes toilet room reconstruction and HVAC system improvements. Storage Building at Johnson ES: Project includes demolition of the existing building. Bradley Creek Bus Garage: Scope includes sanitary system replacement, concrete apron replacement, asbestos floor tile replacement, door replacement, wall reconstruction, electrical wiring replacement and fire alarm replacement. Walk-In Cooler/Freezer: Project includes a new walk-in cooler/freezer. Estimated Construction Budget: General Construction: $4,600,000; Mechanical Construction: $425,000; Electrical Construction: $725,000; Plumbing Construction: $1,800,000; Food Service Construction: $700,000; Asbestos Abatement No. 1: $500,000; Asbestos Abatement No. 2: $250,000; Casework Construction:$1,300,000.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents