Similar Projects
Continuing Professional Consulting Services, Engineering and Inspection (CEI) Services
Term Contract
Bidding
FL

TSM and O Design Continuing Services Contract
Infrastructure
Bidding
$5,000,000 est. value

Material Testing and Threshold Inspections for the Camping World Stadium Improvements Project
Post-Bid
Orlando, FL

Survey Roads to Support Rebuild
Post-Bid

One-Time Purchase of Fire-Smoke Damper Inspections
Results
Orlando, FL 32814

J065--Annual Sterilizer Maintenance & Repair Services At Orlando VA Healthcare System (OVAHCS)
Results
Orlando, FL 32827

Continuing Services for Right of Way Consultant Services
Infrastructure
Bidding
$5,000,000 est. value

Multifamily Housing (MFH) Construction Inspection Services Contract
Post-Bid

Professional Construction Engineering Inspection (CEI) and Compliance Services for the Oakland Roundabout Construction Project
Results
Orlando, FL 32801

Professional Construction, Engineering and Inspection (CEI) Services for Lift Station No. 1
Post-Bid
Maitland, FL

Professional Engineering Consultant for SR 538 Widening from Ronald Reagan to Cypress Parkway (Design-Build)
Results
Orlando, FL 32825

Building and Inspection Services
Alteration
Post-Bid
Eatonville, FL

Professional Engineering Consultant CEI Services for Intelligent Transportation Systems, Lighting and Tolling Projects
Results

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

Resurface and Safety Improvements Orange/Sumter County
Results
Less than $5,300,000 est. value

Reported 03/22/2022 12:00 AM
Project Title

Reverse Osmosis Water Systems Maintenance

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

a. Maintain water quality, reduce equipment failure and extend the useful life of the RO system. b. Be in compliant with the guidelines and parameters established by the Association for the Advancement of Medical Instrumentation (AAMI) Technical Information Report (TIR)34: 2014(r02017, “Water for Reprocessing of Medical Devices” and the Center for Medicare and Medicaid Services (CMS). c. Monitor the frequency of quality testing and limits for the noted contaminants in utility and critical water. d. Inspect and record data after each service

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 22 - Plumbing, Common Work Results for Plumbing, Processed Water Systems for Laboratory and Healthcare Facilities, Processed Water Equipment for Laboratory and Healthcare Facilities, Reverse-Osmosis Water Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents