Last Updated | 12/27/2023 09:06 AM |
Project Title | Upriver Dam Spillway Rehabilitation Phase III |
Physical Address | View project details and contacts |
City, State (County) | Spokane, WA 99201 (Spokane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,374,015 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of November 13 203, the project has been awarded, however, a timeline for construction has not been confirmed. This project consists of the rehabilitation of the spillway concrete piers, repair of select cracks on the vertical faces of the piers and the abutment walls, demolition and replacement of pier extensions on the spillway hoist deck, repairs to the hoist deck concrete, installation of expansion joint seal assembly to seal a leaking vertical expansion joint on the spillway left abutment upstream guide wall, inspection and cleaning of the horizontal drains in the downstream left abutment wall and the OGEE drains in bay 7 and 8, Tainter Gate No. 5 structural repairs, replacement of both Tainter Gate No. 5 trunnion pins, and other related miscellaneous items. Cashier's check, a certified check or surety bond in the sum of five percent (5%) of the Total Project Bid must accompany the copy of the bid filed with the City Clerk. Successful bidder shall execute the Contract within TEN (10) calendar days after receiving the Contract. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated herein, the bid proposal deposit shall be forfeited to the City of Spokane. The City of Spokane will normally award this Contract or reject bids within FORTY-FIVE (45) calendar days after the time set for the bid opening. If the lowest responsible Bidder and the City of Spokane agree, this deadline may be extended. If they cannot agree on an extension by the 45-calendar day deadline, the City of Spokane reserves the right to Award the Contract to the next lowest responsible Bidder or reject all Bids. Point of Contact: jehansen@spokanecity.org |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |