Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Rabbit Valley Recreation Area Improvements
Demolition, Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Mack, CO 81525

Roadway Reconstruction
Infrastructure
Bidding
$20,000,000 CJ est. value
Grand Junction, CO 81507

Grand Junction High School - Bid Package #4
New Construction, Infrastructure - 240,000 SF
Sub-Bidding
$65,000,000 CJ est. value
Grand Junction, CO 81501

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Northside Transmission Main Valve Replacement Project
Results
Less than $464,375 est. value
Grand Junction, CO 81505

27 inch Transmission Line Upgrade Project
Results
$450,000 est. value
Clifton, CO

ML 47 Improvement Project
Construction
$730,000 est. value
Clifton, CO 81520

Two Rivers Convention and Events Center Hotel
Addition, New Construction, Build-out, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grand Junction, CO 81501

RFQ Engineering - Orchard Avenue (E Road) Safety and Connectivity Project Phase I
Infrastructure
Bidding
$3,000,000 CJ est. value
Grand Junction, CO 81501

BLM-CO - Mud Springs Campground Improvements
Infrastructure, Renovation
Post-Bid
$1,000,000 CJ est. value
Glade Park, CO 81523

Dowd Junction Service Line Replacement
Results
$400,000 est. value
Grand Junction, CO 81504

2022 Sidewalk Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Fruita, CO 81521

Shell Building for Chipotle Mexican Grill - Sutherlands Redevelopment / Grand Junction
New Construction, Infrastructure - 2,337 SF
Post-Bid
$715,000 CJ est. value
Grand Junction, CO 81505

Last Updated 08/05/2022 03:04 PM
Project Title

2022 Sewer Line Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Clifton, CO 81520   (Mesa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $422,578 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of installation of approximately: 166 lineal feet of 6-inch and 3,763 lineal feet of 8-inch glass reinforced UV Cured in Place Pipe (CIPP), Rehabilitation of 7 sanitary sewer manholes, Bypass Pumping, Traffic Control, Mobilization, work schedule coordination, and other appurtenant work. The March 2020 edition of the Clifton Sanitation District General Contract Conditions , Plans, Specifications and other Proposal Documents will be available for review or download May 27, 2022 on the Clifton Sanitation District page at https://www.cliftonsanitation.com/Bids-Proposals. For contractual or technical information, please contact Erik Snyder, PE - JUB Engineers Project Manager (970-208-8508). A pre-proposal meeting will NOT be held for this project. Deadline for submission of questions related to this proposal is June 17, 2022. No questions will be accepted after this date. Addenda, if required, will be issued June 24, 2022. The District Office will stamp the date and mark the time received on all proposals. Proposals not received prior to the date and time indicated on the Request for Proposal will not be considered. The District is not responsible for delays occasioned by the U.S. Postal Service, the internal mail delivery system of the District, or any other means of delivery employed by the Proposer. Each Proposal shall be submitted on a form furnished by the District and must be accompanied by a certified check, cashier s check or Bid Bond in an amount not less than 5% of the amount of the Proposal and made payable to the Clifton Sanitation District, Colorado. The successful Proposer will be required to furnish a Performance Bond and a Labor and Material Payment Bond, both in the amount of 100% of the total Contract amount, in conformity with the requirements of the Contract Documents and on forms provided by the District. The District reserves the right to accept or reject any or all offers received in response to this solicitation and to waive any irregularities as may be in the best interest of the District.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents