Similar Projects
Starling Development - Phase 3
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Kalispell, MT 59901

Water Mains With Fowler Corridor Street Improvements - WIF58 - City of Bozeman
Infrastructure
Conception
$900,000 est. value
Bozeman, MT 59718

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure
Design
$13,579,200 CJ est. value
Kalispell, MT 59901

Cottonwood Road (Oak to Baxter)
Infrastructure
Bidding
$500,000 CJ est. value
Bozeman, MT 59718

Cottonwood Road (Oak to Baxter)
Infrastructure
Bidding
$500,000 CJ est. value
Bozeman, MT 59718

Custer County Fire Hall Additions - Selective Packages
Addition, Demolition, Infrastructure - 7,600 SF
Sub-Bidding
$250,000 CJ est. value
Miles City, MT 59301

Bozeman Public Library
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,500,000 CJ est. value
Bozeman, MT 59715

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2022 Street Improvement Project
Infrastructure
Construction
$615,307 CJ est. value
Lewistown, MT 59457

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Three Rivers Bank
New Construction, Infrastructure - 6,300 SF
Pending Verification
$1,000,000 CJ est. value
Whitefish, MT 59937

Fowler Connection (Huffine to Oak) - SIF114 - City of Bozeman
Infrastructure
Conception
$8,000,000 CJ est. value
Bozeman, MT 59718

Last Updated 12/09/2022 02:07 PM
Project Title

Phase 4B Water System Improvements

Physical Address View project details and contacts
City, State (County) Cut Bank, MT 59427   (Glacier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,749,940 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Water Storage Tank Description: The project consists of the construction of a 1 million gallon prestressed concrete water storage tank with appurtenant pipe and fittings, and all associated site work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents