Similar Projects
Riverside Levees Pl 84-99 Rehabilitation Project
Renovation, Infrastructure
Design
$25,000,000 to $100,000,000 est. value
Riverside, CA

USACE Levee Repair
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
San Joaquin, CA

USACE SPK American River Common Features (ARCF) Lower American River (LAR) Project 2 - Erosion Control, Bank Protection, and Stabilization
Alteration
Bidding
$25,000,000 to $100,000,000 est. value
Sacramento, CA 95827

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Hoover Elementary School Drainage Design
Term Contract, Alteration
Bidding
Burlingame, CA

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Post-Bid
$76,000,000 est. value
Olancha, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Place Reinforced Concrete Pipe and Cured in Place Pipeliner
Infrastructure
Bidding
$490,000 est. value
Elk Creek, Willows, CA

American River Common Features 2016 Erosion Protection Project
Term Contract
Post-Bid
Sacramento, CA 95814

PW Pedestrian Safety Improvements
Infrastructure
Results
$900,000 est. value
San Francisco, CA 94158

Structural Steel Plate Pipe Arch Invert and Structural Concrete
Infrastructure
Bidding
$780,000 est. value
San Rafael, CA

SSM-THUP Project General Trades Contractor
New Construction, Alteration - 46,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Berkeley, CA 94703

Last Updated 03/17/2022 03:58 AM
Project Title

Clean and Inspect Culvert and Place Cured-in-Place Pipeliner

Physical Address View project details and contacts
City, State (County) Woodland, CA   (Yolo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DVBE Goal - 5% For Construction On State Highway In Yolo County Near Woodland At Various Locations From 0.2 Mile West Of Tabers Corner To 0.4 Mile East Of County Road 22 In District 03 On Route 16 Item No. Item Code Item Description Unit Of Measure Estimated Quantity 1 070030 Lead Compliance Plan Ls Lump Sum 2 090100 Time-Related Overhead (Wday) Wday 25 3 120090 Construction Area Signs Ls Lump Sum 4 120100 Traffic Control System Ls Lump Sum 5 128652 Portable Changeable Message Sign (Ls) Ls Lump Sum 6 129161 Automated Flagger Assistance Device Day Ea 70 7 130100 Job Site Management Ls Lump Sum 8 130200 Prepare Water Pollution Control Program Ls Lump Sum 9 130500 Temporary Erosion Control Blanket Sqyd 6 10 130610 Temporary Check Dam Lf 27 11 130620 Temporary Drainage Inlet Protection Ea 2 12 130640 Temporary Fiber Roll Lf 20 13 130900 Temporary Concrete Washout Ls Lump Sum 14 705011 18" Steel Flared End Section Ea 2 15 710167 Remove Flared End Section (Ea) Ea 2 16 710360 Cleaning, Inspecting, And Preparing Culvert (Lf) Lf 440 17 710380 18" Cured-In-Place Pipeliner Lf 150 18 710382 21" Cured-In-Place Pipeliner Lf 40 19 710384 24" Cured-In-Place Pipeliner Lf 200 20 710390 36" Cured-In-Place Pipeliner Lf 48 21 731502 Minor Concrete (Miscellaneous Construction) Cy 6 22 820112 Marker (Culvert) Ea 18 23 820220 Remove Marker Ea 18

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents