Similar Projects
Replace Chillers 1 and 2 for Paraloft DN 310
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Virginia Beach, VA 23461

Fire Station #1 HVAC Repairs
Renovation
Sub-Bidding
$400,000 CJ est. value
Virginia Beach, VA 23451

Regional HVAC&R
Term Contract, Infrastructure
Post-Bid
Norfolk, Virginia Beach, VA 23511

HVAC Replacement at First Landing State Park
Alteration
Post-Bid
Virginia Beach, VA 23451

Plaza Annex HVAC Replacement
Results
Virginia Beach, VA

Kempsville Library HVAC Equipment Repair
Results
Virginia Beach, VA 23464

Facility Investment Services - HVAC/Chiller Service Contract
Term Contract
Post-Bid
Virginia Beach, VA 23454

Hvac PM and Maintenance
Term Contract, Alteration
Results
Chesapeake, Courtland, Gloucester, Suffolk, Surry, Virginia Beach, Williamsburg, VA 23837

Metro Hanger HVAC
Alteration
Post-Bid
Henrico, VA 23250

First Colonial High School Partial Roof and HVAC
Alteration
Results
Virginia Beach, VA 23454

Replace A/C Chilled Water Pump
Alteration
Post-Bid
$25,000 est. value
Virginia Beach, VA 23455

A.O. Smith LP Gas-Hot Water Heater 100 Gallon-Proprietary
Alteration
Results

Law Enforcement Training Center - HVAC System Repairs
Renovation
Post-Bid
$200,000 CJ est. value
Virginia Beach, VA 23451

Boiler Maintenance and Repair
Term Contract
Results

Remove and Replace Two Visitor Center Geothermal Heat Pump Units
Renovation
Post-Bid
$100,000 CJ est. value
Virginia Beach, VA 23456

Last Updated 11/22/2022 08:32 AM
Project Title

Kingston Elementary School HVAC/MUAU Replacement

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23452   (Virginia Beach City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,107,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Virginia Beach City Public Schools will receive sealed bids/proposals from qualified firms to furnish the goods and/or services for Kingston Elementary School HVAC/MUAU Replacement. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. 2021-3-09 FS 22-11 21028 19.223-M, 21-116 Sets of drawings and specifications may be obtained from Dills Architects with a deposit check made out to Dills Architects in the amount of $150.00 per set. A minimum shipping and handling fee of $25.00 per set will be charged for those contractors who wish to have their sets mailed. Cash deposits will not be accepted. No partial sets will be distributed. Upon returning bid documents to Dills Architects, postage paid, in good condition, free from markings, within ten (10) calendar days after the date of receipt of bids, full deposit will be returned. Documents returned damaged, incomplete or marked up shall be discarded and the deposit used to purchase new documents for use on the project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents