Similar Projects
Construction of Town Green
New Construction
Bidding
Monroe, GA

Aquatics Center
New Construction - 20,764 SF
Bidding
Griffin, GA

C1--Tactical Training Tunnel
New Construction
Post-Bid
Savannah, GA

C1--Tactical Training Tunnel
New Construction
Post-Bid
Savannah, GA

Gordon Lee Hs Bleacher Replacement
Results
Chickamauga, GA

National Seed Lab Dish Station/Restroom Remodel.
Results
$25,000 to $100,000 est. value
Dry Branch, GA 31020

Savannah Arena
New Construction - 149,000 SF
Construction
$165,000,000 est. value
Savannah, GA

Robert S. Train Memorial Recreation Center Rehabilitation Project
Construction
Macon, GA 31202

Gwinnett Place Redevelopment Greenspace and Community Improvements
New Construction, Renovation
Pending Verification
Duluth, GA 30096

Reservoir Restrooms
Renovation
Bidding
Dahlonega, GA

Pedestrian Information Kiosk at Mulberry River Walk
New Construction
Post-Bid
Braselton, GA

Pavilion Renovation
Renovation
Results
Less than $700,000 est. value
Tybee Island, GA

Lanierland Park Phase 2
New Construction - 5,025 SF
Construction
$16,500,000 est. value
Cumming, GA 30041

Park Restroom Building
New Construction
Bidding
Sugar Hill, GA

Miracle Field Dugout Repair
New Construction
Post-Bid
Rocky Face, GA 30740

Reported 04/16/2022 12:00 AM
Project Title

Depot Park - Phase 8

Physical Address View project details and contacts
City, State (County) Kennesaw, GA 30144   (Cobb County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational, Restroom/Bath House
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value Less than $5,700,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of this project include construction of an amphitheater (stage and site improvements), restroom building, and renovation of historic structures. The total project budget is $5.7 million, inclusive of pre-construction, construction, FF&E, contingency, and other owner associated costs.

Details

Misc. Recreational, Renovation, Restroom/Bath House, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents