Similar Projects
Water Station Electrical Improvements - Motor Control Replacement - Station 2, 21 and 22
Alteration
Conception
$820,000 est. value
Schaumburg, IL

Water Station Electrical Improvements - ATS Replacement - Station 20 and 21
Alteration
Conception
$490,000 est. value
Schaumburg, IL

Fan and Louver Power Distribution and Controls Upgrade
Alteration
Bidding
$200,000 est. value
Chicago, IL

ED Vestibule Metal Detection-UIH(University of Illinois Hospital) - Division 05 - Electrical Work
Alteration
Bidding
$850,000 est. value
Chicago, IL 60612

Police Department UPS Replacement
Post-Bid
Northbrook, IL 60062

Classroom Air Conditioning and Electrical Renovations
Renovation
Post-Bid
IL

Berwyn Police Department Fire Pump Controller Replacement
Results
Berwyn, IL 60402

LED Lighting
Results
$90,509 est. value
Palatine, IL

Installation, Repair and Replacement of Various Electrical, Lighting, Traffic Control, Security, Audio-Video and Public Address Systems Infrastructure
Alteration
Bidding
$5,000,000 est. value
Chicago, IL 60666

CoGen Elimination and Generator Installation at Bartlett High School
Post-Bid
Elgin, IL

Healy ES MEP & Holden ES Roof
Results
Chicago, IL 60608

Guaranteed Energy Savings Performance
Alteration
Bidding
$700,000 est. value
Lyons, IL

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

600 Volt Underground Cable
Results
Winnetka, IL

Generator Maintenance and Repair
Alteration
Bidding
$160,000 est. value
Wheeling, IL

Reported 07/19/2022 12:00 AM
Project Title

HITC Switchgear Metering and Preventative Maintenance

Physical Address View project details and contacts
City, State (County) Hines, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible to inspect, test, document deficiencies, repair/refurbish, retest, paint, tag, package and reship/reinstall switchgear breakers at HITC. The Contractor shall provide all necessary labor, tools, material, parts, testing equipment, supervision to service switchgear breakers while maintaining energized circuits/no power disruptions to the data center operation. The overall goal of the project is to upgrade the static trips units on the data center related switchgear breakers, perform preventative maintenance on all facility (house) and data center breakers to ensure compliance with NFPA/NEC 70E. The Contractor shall: o CLIN 1: Purchase and install eleven (11) of the Utility Relay Company's AC PRO II (or equal) static trip units, broken down as follows: - Five (5) DS-206 switchgear breakers with 120v controls (currently installed and operational). - Six (6) bench stock DS-206 switchgear breakers (refurbished/benchstock). - Purchase and install a Monitoring and Control System that is compatible to the static trip units that display's, monitor's, and log's power consumption (Amps/Voltage/KVA) of each breaker and cumulative of the entire system. One unit will be Wi-Fi and internet compatible to the VA system where the user can access it from any VA device. The other unit will be a control device at the system of operation.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents