Project Title | Alcott Elementary School - ACM Abatement - Abatement - Environmental Contractors (for Abatement Jobs Only) 99% of Work Driven by MEC) |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60614 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $84,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions Due Date: Dec 19th 2022, 7:30 PM CST ACM Abatement (Glovebag) 1) Glove Bag Removal of Pipe Insulation & Associated Fittings (3 Bathroom Pipe Chases, 3 Areas in basement) 2) Details and Requirements 3) Details and Requirements 4) Details and Requirements 5) Details and Requirements 6) Details and Requirements 7) 8) Contractor to secure necessary permits. 9) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 10) Not responsible for contractor errors as a result of non-field verification. 11) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 01 56 11 General Dust, Fume, and Odor Controls (1) b) SECTION 02 82 14 Asbestos Abatement - Interiors 12) Secure job site overnight if work is not completed in one day. 13) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 14) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 15) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 16) Contractor is to remove and dispose of materials torn out and any construction debris. 17) All trash must be removed off-site by contractor. 18) Clean the surrounding area and make sure all is swept of debris. 19) All questions/requests must be received two (2) business days prior to bid closing. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |